Nomination Recognition 2017


        Report by Cross Functional Team

       CATEGORY:         CROSS FUNCTIONAL TEAM AWARD

       PROJECT:          Wooster Rail Unloading Team

       CATEGORY:        INNOVATIVE WAYS OF WORKING

       NOMINATOR:       Thomas Scarberry
       SPONSOR:         7970

       LEADER:          7879,4047

       PROFILE:
       Describe the situation or event related to the individual's or team's performance.
         The team delivered extraordinary results given all the challenges that were new to
       GOJO as part of bringing rail cars of ethanol to the Wooster site.  The initial plan to
       reactivate the existing Wooster rail, was eliminated by a Norfolk Southern review
       which revealed that the curve that was once appropriate for rail cars, was too tight
       for those used for our application.  This required a rework of the plan, which the
       team addressed quickly and efficiently coming up with a superb option for the rail
       unloading site.  The complexity required to ensure safe operations of Ethanol
       loading and operating at heights was beyond our initial considerations.  However,
       the team continued to excel and took our learnings and adapted our approach to
       deliver superior safety operations of our new rail car system on site ?setting higher
       standards for fall protection than those of our current vendor.  The vapor recovery
       system designed by GOJO engineers eliminated the need for an EPA emissions
       permit and the annual record keeping required to maintain it.   The team used
       foresight to lay the foundation for expansion of the system by piping ethanol into the
       building as we build out blending operations at Wooster in the future, and by
       incorporating into the design a potential future rail expansion into the rail bay in
       building 64 or construction of a second siding to the south with minimal disruption to
       the existing rail siding service.  By overcoming many challenges, adapting the plan,
       and executing with excellence, and working together as a team the first rail car was
       delivered and unloaded ahead of schedule at Wooster Campus.  Working
       effectively as a cross functional team and leveraging learning of outside partners
       the team delivered a new to GOJO operations.

       Describe in detail the individual's or team's notable behaviors.
          ? Collaboration capabilities with internal cross functional team members as well as
        with outside partners that offered valuable learnings to help us shape the solution
          ? Dealing with ambiguity throughout the project as the team learned and adapted
        solutions to ensure we could off load ethanol in an efficient and safe manner to
        support operations
          ? Learning on the fly to proactively seek out others that performed similar
        activities/operations and engage to learn best practices and risk points - to learn
        from others experiences


       What were the results of the individual’s or team’s behaviors?
          ? Rail car successfully delivered to Wooster site and successfully loaded,