SOUTH EAST
          Southampton








          “From our base here on the South Coast, with the      2
          commitment and support of a strong group of people,
          we have demonstrated our ability to deliver a high
          quality service to our clients.

          The biggest success of last year was the development of two of our younger
          members of staff. Ben Oliver – Trainee Mechanical Estimator bid and secured
          his first project for us which was a massive personal success for him and the
          business. The second was James Guy – Project Engineer who successfully
          managed and completed a very challenging project called Cherry Gardens
          School. Ben and James, congratulations on your success.
          Throughout 2019 we have a number of significant aims. Our strategy
          to win work continues and with great success so far with over 70% of our
          budget secured to date. Work will then continue to secure bids to meet the
          remainder of our budget for 2019 and on to 2020. Our focus remains on
          delivering a high quality service to our clients and remaining the ‘contractor of
          choice’. Our work ethic is simple but effective: ‘Do what we say we will’.   UCL’s central monitoring facility in   4-5. KHALSA ACADEMY –
                                                               London. The building Management   ONGOING
          In collaboration with our Business Development Director – Michael Lealan,   System, Lighting Control, Emergency   Client: Galliford Try
          the aim is to expand our current client base over the next 12 months. We   Lighting Battery Monitoring and Fire   Sector: Education
  24      have developed a “Business Unit Action Plan” with a target client base that is   Alarm systems are also remotely
          prepared and ready for launch. We will also be looking to diversify our offer by   monitored by UCL. The project is now   Following a successful design process
          venturing in to small works projects.                in its final stages with completion due   for the full M&E services, design
                                                               in early 2019.             and installation, Lorne Stewart have
          As you can see, we have a busy year ahead of us. It’s going to be important to   commenced this 70-week occupied
          have some fun as a team and I am very much looking forward to an enjoyable      building project. The live environment
          and successful 2019 with you all.”                   3. CAPSTAN HOUSE           requires multiple phased handovers.
                                                               Main Contractor: Galliford Try  1-4 have been successfully
          Luke McCathie                                                                   completed and commissioned on
          Regional Director, South East, Lorne Stewart Engineering  A Design and Build contract for the   programme.
                                                               refurbishment of a nine-storey office
                                                               building at East India dock London.    A temporary entrance has been
                                    2. ASTOR COLLEGE LONDON    This project involves the removal   designed, built and installed with life
                                    Client: Galliford Try      and replacement of six AHUs and the
                                    Sector: Education          replacement of eight rising busbars   safety repeater panels and will be
                                                                                          changed to the main panels during
          1                                                    while maintaining services for the   the commissioning of phase 2.
                                    Astor College is a predominately   occupied sections of the building.  The existing data/communications
          1. WINCHESTER UNIVERSITY,     seven-storey building with a six-storey           rooms were changed over to maintain
          WEST DOWNS CAMPUS         new build extension. The building   The services consist of VAV boxes   data/Wi-Fi/CCTV at all times which
          Client: Osborne Construction  is used for student accommodation   with LTHW services to heater batteries   proved very challenging. The existing
          Type: Higher Education    and is owned and run as part of the   with chilled water service to the new   main switch panel changeover was
                                    University College London (UCL).    AHUs. Existing radiant panel heating    carried and coordinated with the
          This new build project is a gateway   The building comprises 272   is being extended on some floors   service provider in order to maintain
          building for the University of Winchester   bedrooms of various types, mainly   while other services include a full    constant power to the school.
          and is located on the main campus   single, some doubles, en-suites, and   new lighting and power installation,   The DWS and LTHW services were
          area of the University. The building   some rooms for disabled usage. There   fire alarm and disabled alarm    designed to maintain cold water
          comprises teaching spaces, an open   are approximately 50 communal   systems and PV installation to the   to the school at all times. Lorne
          plan gallery and café, an auditorium,   kitchens and 14 communal bathroom   extension roof.  Stewart aim to receive PC eight weeks
          studios, offices, a library and other   blocks each containing three self-      ahead of programme which
          associated core rooms.    contained shower rooms.    The ground floor of the building will   will exceed customer expectations
                                                               provide new retail units with gas,
          Having completed the design   Lorne Stewart have designed and   water, LTHW and power via a new
          development over the summer, Lorne   installed all MEP systems, which   distribution system. The project is due
          Stewart started the construction   include a Photovoltaic array installed   for completion in spring 2019
          phase in December 2018, with project   to the main roof area. All electrical
          completion expected in October 2019.   metering is monitored remotely from