      3                                                     6. CASTLE HILL SCHOOL      1 plant room services feeding phase
                                                            Client: Osborne            2 in underground trenches. There are
                                                            Type: Education            eight new classrooms and four new
                                                                                       toilet blocks.
                                                            This phase 2 new build school project
                                                            is a new building built on the same   Design development at present is
                                                            grounds as phase 1. This project   almost complete and Lorne Stewart
                                                            is a design and build project which   will be ready to commence the project
                                                            extends to the already installed phase   late November 2018.


                                                             6














      4                                                      7                          8












                                                                                                                    25


                                                            mobility aids are stored in designated
       5                                                                               8. GUNNERSBURY PARK SPORTS
                                                            spaces and fixed lifting and   FACILITY - NEW
                                                            manoeuvring systems are utilised in   Client: Kier (Southern)
                                                            each of the classrooms. This markedly   Type: Leisure
                                                            increases the time required to
                                                            evacuate the building and also means   Southampton have been appointed
                                                            that the availability of all of the lifts   to carry out the pre-designed M&E
                                                            must be maintained in the event of a   installation to this new sports centre.
                                                            fire, unless they are located within the   The complex will provide a multi-use
                                                            fire zone.                 sports hall, fitness suite, weights
                                                                                       and equipment room as well as all
                                                            The specific acoustic demands of   associated changing and shower
                                                            the locality has meant that, due to   facilities for the outside sports pitches.

       7. CHERRY GARDEN (SPECIAL   Due to the special needs of the   the ongoing testing regime for a   There are also general offices, a café
                                                            generator, it is not deemed to be an
       EDUCATION NEEDS) SCHOOL    children, the environment has been   acceptable solution to this ‘back-  and kitchen area. A proportion of the
       Client: Galliford Try /    developed so that temperatures are                   ground floor space has been set aside
       London Borough of Southwark  maintained to ensure the behaviour   up’ power requirement. Therefore   and designated as store room and
       Sector: Education          of the children is not effected. This   the development of a design which   office for a local museum.
                                  is being achieved by the installation   includes individual static inverters and
       This is a new build school comprising   of local AHUs for each area and   battery banks to be situated adjacent   On site construction has commenced
       a total of 12 classrooms including   VRF systems to the teaching spaces   to each of the lift shafts and also   and we are currently carrying out
       Nursery, Reception, KS1and KS2   and does not allow for any natural   separate inverters to maintain power   pre-construction deliverables ahead
       and will provide ancillary facilities   ventilation.  to each of the main sprinkler pumps   of our start on site in January with
       including soft play areas, music                     was important. The project completed   completion due in June 2019.
       and art therapy rooms, a trampoline   The specific requirements of   at the end of September with the
       room and a hydrotherapy pool for   a building with a high level of   school staff commencing occupation
       approximately 70 children with   wheelchair dependency amongst its   and set up of the facilities so that they
       diverse special educational needs.  users presents challenges in terms   were ready to welcome the children
                                  of both the general circulation of its   for the first time following the October
                                  occupants and their evacuation in an   half term.