EXCELLENCE THROUGH OUR PEOPLE, PROCESS AND PERFORMANCE
3 6. CASTLE HILL SCHOOL 1 plant room services feeding phase
Client: Osborne 2 in underground trenches. There are
Type: Education eight new classrooms and four new
toilet blocks.
This phase 2 new build school project
is a new building built on the same Design development at present is
grounds as phase 1. This project almost complete and Lorne Stewart
is a design and build project which will be ready to commence the project
extends to the already installed phase late November 2018.
6
4 7 8
25
mobility aids are stored in designated
5 8. GUNNERSBURY PARK SPORTS
spaces and fixed lifting and FACILITY - NEW
manoeuvring systems are utilised in Client: Kier (Southern)
each of the classrooms. This markedly Type: Leisure
increases the time required to
evacuate the building and also means Southampton have been appointed
that the availability of all of the lifts to carry out the pre-designed M&E
must be maintained in the event of a installation to this new sports centre.
fire, unless they are located within the The complex will provide a multi-use
fire zone. sports hall, fitness suite, weights
and equipment room as well as all
The specific acoustic demands of associated changing and shower
the locality has meant that, due to facilities for the outside sports pitches.
7. CHERRY GARDEN (SPECIAL Due to the special needs of the the ongoing testing regime for a There are also general offices, a café
generator, it is not deemed to be an
EDUCATION NEEDS) SCHOOL children, the environment has been acceptable solution to this ‘back- and kitchen area. A proportion of the
Client: Galliford Try / developed so that temperatures are ground floor space has been set aside
London Borough of Southwark maintained to ensure the behaviour up’ power requirement. Therefore and designated as store room and
Sector: Education of the children is not effected. This the development of a design which office for a local museum.
is being achieved by the installation includes individual static inverters and
This is a new build school comprising of local AHUs for each area and battery banks to be situated adjacent On site construction has commenced
a total of 12 classrooms including VRF systems to the teaching spaces to each of the lift shafts and also and we are currently carrying out
Nursery, Reception, KS1and KS2 and does not allow for any natural separate inverters to maintain power pre-construction deliverables ahead
and will provide ancillary facilities ventilation. to each of the main sprinkler pumps of our start on site in January with
including soft play areas, music was important. The project completed completion due in June 2019.
and art therapy rooms, a trampoline The specific requirements of at the end of September with the
room and a hydrotherapy pool for a building with a high level of school staff commencing occupation
approximately 70 children with wheelchair dependency amongst its and set up of the facilities so that they
diverse special educational needs. users presents challenges in terms were ready to welcome the children
of both the general circulation of its for the first time following the October
occupants and their evacuation in an half term.
emergency situation. The children’s