Page 35 - Hive 28 March 2019
P. 35

EXCELLENCE THROUGH OUR PEOPLE, PROCESS AND PERFORMANCE





       3. MONKERTON DEVELOPMENT  Rotary Building Services Yorkshire is   deliver to the subterranean energy   E.ON are delivering the district heating
       Client: E.ON              responsible for the design, supply,   centre in north west London. E.ON   scheme using combined heat and
                                 installation and management of the   are working on behalf of the client   power plant to provide a low carbon
       E.ON has contracted Rotary Building   mechanical, electrical and plant   the Inglis consortium as their district   energy system.
       Services Yorkshire to design and   works, as well as full commissioning   heating installation contractor this
                  2
       deliver a 10,000ft , £30 million   and testing of the energy centre.  is a 40 year agreement.   John Balderstone, Regional Director
       energy centre and district heating   John Balderstone, Regional Director        said, “We are really looking
       network.                  commented, “This is an important   The new energy centre will provide   forward to again working with
                                 continuation of our partner   a central source of hot water   E.ON on this project, this is our
       The Energy Centre will provide a   agreement to enhance our current   and heating for 1,596 residential   second such project secured with
       sustainable and cost-effective source   framework of projects with E.ON”.  dwelling as well as some minor   E.ON and we hope this will lead
       of heat and hot water to 2,800                       commercial space. Rotary Building   on to yet more over the coming
       homes and businesses across this   4. MILLBROOK PARK ENERGY   Services Yorkshire is responsible for   months and years”.
       major new development, designed to   CENTRE, MILL HILL, LONDON  the design, supply, installation and
       serve the growing population of the   Client: E.ON   management of the mechanical,                   4
       Greater Exeter area. It will also provide            electrical and plant works, as well as
       low carbon electricity to the nearby   Starting on site June 2018 with a   full commissioning and testing of the
       Exeter Science Park with any surplus   finish date of February 2019,  energy centre.
       electricity being fed back into the   E.ON has contracted Rotary Building
       national grid.            Services Yorkshire to design and

       3                                                     5                          6











                                                                                                                    33










                                                            5&6. ROTARY HAVE BEEN      BOOTS WARWICK
                                                            INCLUDED IN THE BOOTS THE   Client: Boots
                                                            CHEMIST FRAMEWORK
                                                            PROJECTS FOR OVER 40 YEARS.  As principal contractors, Rotary
                                                                                       provided new LED lighting and
                                                            BOOTS SHREWSBURY           emergency lighting, new electrical
                                                            Client: Boots              mains including metering and surge
                                                                                       protection, as well as installation of a
                                                            As principal contractors, Rotary   new fire Alarm system as members
                                                            provided new LED and emergency   of BAFE accreditation.
                                                            lighting throughout store, new
                                                            electrical mains including metering   Rotary were responsible for the
                                                            and surge protection. Busbar trunking   asbestos strip out works and installed
                                                            was installed throughout the ground   new control system for the power and
                                                            and first sales floor to future proof   lighting including PIR’s to ensure the
                                                            the store for upcoming refits. Rotary   energy consumption was reduced.
                                                            installed a new control system for the   Busbar trunking was installed
                                                            Power and Lighting including PIR’s to   throughout the ground sales floor to
                                                            ensure the energy consumption was   future proof the store for upcoming
                                                            reduced. The store was upgraded   refits. A key clamp barrier was
                                                            by night ensuring the store was   installed to protect the distribution
                                                            kept trading every day including no   from damage. The store was
                                                            disruptions to their EPOS systems.  upgraded by night ensuring the store
                                                                                       was kept trading every day including
                                                                                       no disruptions to their EPOS systems.