EXCELLENCE THROUGH OUR PEOPLE, PROCESS AND PERFORMANCE
3. MONKERTON DEVELOPMENT Rotary Building Services Yorkshire is deliver to the subterranean energy E.ON are delivering the district heating
Client: E.ON responsible for the design, supply, centre in north west London. E.ON scheme using combined heat and
installation and management of the are working on behalf of the client power plant to provide a low carbon
E.ON has contracted Rotary Building mechanical, electrical and plant the Inglis consortium as their district energy system.
Services Yorkshire to design and works, as well as full commissioning heating installation contractor this
2
deliver a 10,000ft , £30 million and testing of the energy centre. is a 40 year agreement. John Balderstone, Regional Director
energy centre and district heating John Balderstone, Regional Director said, “We are really looking
network. commented, “This is an important The new energy centre will provide forward to again working with
continuation of our partner a central source of hot water E.ON on this project, this is our
The Energy Centre will provide a agreement to enhance our current and heating for 1,596 residential second such project secured with
sustainable and cost-effective source framework of projects with E.ON”. dwelling as well as some minor E.ON and we hope this will lead
of heat and hot water to 2,800 commercial space. Rotary Building on to yet more over the coming
homes and businesses across this 4. MILLBROOK PARK ENERGY Services Yorkshire is responsible for months and years”.
major new development, designed to CENTRE, MILL HILL, LONDON the design, supply, installation and
serve the growing population of the Client: E.ON management of the mechanical, 4
Greater Exeter area. It will also provide electrical and plant works, as well as
low carbon electricity to the nearby Starting on site June 2018 with a full commissioning and testing of the
Exeter Science Park with any surplus finish date of February 2019, energy centre.
electricity being fed back into the E.ON has contracted Rotary Building
national grid. Services Yorkshire to design and
3 5 6
33
5&6. ROTARY HAVE BEEN BOOTS WARWICK
INCLUDED IN THE BOOTS THE Client: Boots
CHEMIST FRAMEWORK
PROJECTS FOR OVER 40 YEARS. As principal contractors, Rotary
provided new LED lighting and
BOOTS SHREWSBURY emergency lighting, new electrical
Client: Boots mains including metering and surge
protection, as well as installation of a
As principal contractors, Rotary new fire Alarm system as members
provided new LED and emergency of BAFE accreditation.
lighting throughout store, new
electrical mains including metering Rotary were responsible for the
and surge protection. Busbar trunking asbestos strip out works and installed
was installed throughout the ground new control system for the power and
and first sales floor to future proof lighting including PIR’s to ensure the
the store for upcoming refits. Rotary energy consumption was reduced.
installed a new control system for the Busbar trunking was installed
Power and Lighting including PIR’s to throughout the ground sales floor to
ensure the energy consumption was future proof the store for upcoming
reduced. The store was upgraded refits. A key clamp barrier was
by night ensuring the store was installed to protect the distribution
kept trading every day including no from damage. The store was
disruptions to their EPOS systems. upgraded by night ensuring the store
was kept trading every day including
no disruptions to their EPOS systems.