Page 44 - STARTER KIT SHIFT ENGINEER
P. 44
STARTER KIT | Shift Engineer
l. Booster Electric Pump
m. Submersible Pump
n. Air Conditioning Unit
o. Glass Top Upright Freezer
p. Chest Type Freezer
q. Wifi/Internet System
r. PABX /Telephone System
s. Azalea Van
t. Cable TV Reception/Connections
Task 11: Supervise on-going projects and update accomplishment report per project
OPERATING PROCEDURES STANDARD(s)
1. Review schedules of projects in the department and
check on a daily basis on-going project schedule.
2. Ensure that staff are given task assignment per
project based on their competencies.
3. Monitor status of on-going projects and update
accomplishments.
4. Ensure that on-going projects are being done Ensure that on-going projects are in accordance to the
according to approve project specifications. approved schedules and project requirements. Deviations
shall be coordinated and reported to the Hotel Engineer for
proper course of actions.
Task 12: Perform ocular inspection of rooms, public areas, function rooms and offices
OPERATING PROCEDURES STANDARD(s)
1. Update Rooms Inspection Monitoring Report. Each shift engineer is required to inspect at least five (5)
Inspect at least a minimum of five (5) rooms. rooms per day/shift.
a. Inspect and check all appliances (TV, DVD,
Refrigerator, Telephone, Water Heater,
Ceiling Fan, Exhaust Fan, Chain Lock, Safety
Deposit Box, Airpot/Electric Kettle, Microwave
Oven, Cable Connection, Electric Burner, and
Range hood).
a. Inspect and check all plumbing details and
materials (Water Closet, Faucet,
Sink/Lavatory, Bidet, Shower, Sprinkler, Floor
Drain, Water Leaks, Ceiling Leaks and P-
Trap).
b. Inspect and check all electrical details and
materials (Door Lockset, ESD, Pinlights,
Droplight, Bedside Lamp, Switches,
Lampshade, Smoke Detectors and Circuit
Breakers).
c. Inspect and check all carpentry details and
materials (Bed/Sofa Bed, Tables, Chairs,
Cabinets, Blinds/Curtains, Sliding Doors,
39