STARTER KIT | Shift Engineer


                        l.   Booster Electric Pump
                        m.  Submersible Pump
                        n.  Air Conditioning Unit
                        o.  Glass Top Upright Freezer
                        p.  Chest Type Freezer
                        q.  Wifi/Internet System
                        r.   PABX /Telephone System
                        s.  Azalea Van
                        t.   Cable TV Reception/Connections



               Task 11:  Supervise on-going projects and update accomplishment report per project

                          OPERATING PROCEDURES                                 STANDARD(s)

                 1.   Review schedules of projects in the department and
                      check on a daily basis on-going project schedule.

                 2.   Ensure that staff are given task assignment per
                      project based on their competencies.

                 3.   Monitor status of on-going projects and update
                      accomplishments.

                 4.   Ensure that on-going projects are being done   Ensure that on-going projects are in accordance to the
                      according to approve project specifications.   approved schedules and project requirements. Deviations
                                                               shall be coordinated and reported to the Hotel Engineer for
                                                               proper course of actions.


               Task 12: Perform ocular inspection of rooms, public areas, function rooms and offices

                          OPERATING PROCEDURES                                 STANDARD(s)

                   1.  Update Rooms Inspection Monitoring Report.   Each shift engineer is required to inspect at least five (5)
                       Inspect at least a minimum of five (5) rooms.   rooms per day/shift.
                        a.    Inspect and check all appliances (TV, DVD,
                           Refrigerator, Telephone, Water Heater,
                           Ceiling Fan, Exhaust Fan, Chain Lock, Safety
                           Deposit Box, Airpot/Electric Kettle, Microwave
                           Oven, Cable Connection, Electric Burner, and
                           Range hood).
                        a.  Inspect and check all plumbing details and
                           materials (Water Closet, Faucet,
                           Sink/Lavatory, Bidet, Shower, Sprinkler, Floor
                           Drain, Water Leaks, Ceiling Leaks and P-
                           Trap).
                        b.  Inspect and check all electrical details and
                           materials (Door Lockset, ESD, Pinlights,
                           Droplight, Bedside Lamp, Switches,
                           Lampshade, Smoke Detectors and Circuit
                           Breakers).
                        c.  Inspect and check all carpentry details and
                           materials (Bed/Sofa Bed, Tables, Chairs,
                           Cabinets, Blinds/Curtains, Sliding Doors,