Page 45 - STARTER KIT SHIFT ENGINEER
P. 45
STARTER KIT | Shift Engineer
Tissue/Towel Racks, Door Stopper, Windows,
Doors, Vanity Mirrors, Floors, Walls and
Ceilings).
d. Inspect and check WIFI and internet
connectivity.
2. Update Public Area, Function Rooms and Offices
Inspection Monitoring Report.
a. Inspect and check all walls for cracks and
paint quality.
b. Inspect and check roofing and ceiling for
leaks.
c. Inspect and check all doors and windows.
d. Inspect and check floor for cracks, tile
grouting and flooring elevation.
e. Inspect and check all plumbing details and
materials (Water Closet, Faucet,
Sink/Lavatory, Bidet, Floor Drain, Water
Leaks, Ceiling Leaks and P-Trap).
f. Inspect and check all electrical details and
materials (Lighting Appearance, Power
Outlets, Smoke Detectors and Circuit
Breakers).
g. Inspect and check all carpentry details and
materials (Tables, Chairs, Cabinets, Drawers,
Shelves, Doors, Door Stopper and Door
Closer).
h. Inspect and check ventilation details and
materials (Air Conditioning Units, Ceiling Fan
and Exhaust Fan).
3. Inspect and check WIFI and internet connectivity.
Task 13: Evaluate and assess job order requests
OPERATING PROCEDURES STANDARD(s)
1. Respond immediately to equipment breakdown.
2. Evaluate status of the equipment and make
appropriate resolutions and recommendations.
3. Assign repair works to maintenance personnel
depending on the priority list of job orders.
4. Follow-up status of pending Job Order Requests to
the assigned personnel.
40