Page 12 - Bernardon Proposal-Lindenwold Fire Department
P. 12
www.bernardon.com
■ Description of the typical exterior wall assemblies. MPEFP systems into the design of the facility.
■ Structural system basis-of-design narrative.
■ Mechanical, Plumbing, Electrical, and Fire The following services and documents are included as
Protection (MPEFP) systems: part of this phase:
o Perform preliminary HVAC calculations,
determine HVAC systems, zones, estimated ■ Design services as described above.
capacity, and estimated equipment sizes/ ■ Prepare design development drawings including
weights. floor plan, roof plan, elevations, and sections as
o Perform estimated building electrical load required to describe the scope of the project.
calculations. ■ Develop building sections and typical wall
o Perform estimated building gas load sections and description of the building envelope
calculations. assemblies.
o Identify main building utility locations, ■ Interior design and finish selections. Finish
estimated sizes, and meter locations, and selections will include flooring materials, paints,
coordinate utility work with the civil engineer. laminates, and wall and ceiling materials.
o Identify main ductwork distribution. ■ Prepare an interior finish schedule.
■ Prepare a budgetary estimate of construction ■ Design and develop structural framing and
through the engagement of a respected General foundation building plan drawings that will
Contractor who will also be given the opportunity include column locations and orientation,
to participate in the bidding of the Work. braced bays and beam sizes along with the
building foundation type and sizes based on the
We have included a total of three (3) schematic geotechnical investigations provided by others.
design meetings with you to review the progress and ■ Prepare design development drawings for
development of the design and to gain your approval MPEFP systems to establish and describe the
to proceed to the design development phase. size and character of the systems and to allow
coordination with other disciplines. Included in
We anticipate completion of this phase within eight this scope of work will be:
(8) weeks of the notice to proceed. o Final load calculations for all systems and
zones.
o Final sizing of all major MEP equipment
Phase III – Design Development rooms, duct and pipe chases.
o Establishment of service clearances.
Upon receiving your notice to proceed with this o Coordination with site utility drawings.
phase, we will begin to refine the design in terms ■ Prepare an Estimate of Probable Construction
of aesthetics, functional requirements, interior Cost through the engagement of a respected
and exterior finishes, materials, and building General Contractor who will also be given the
systems. Additionally, we will be coordinating our opportunity to participate in the bidding of the
architectural and interior design services with those Work.
of our engineering consultants in order to identify
and integrate the requirements of the structural and
BERNARDON | Proposal for Professional Design Services