Page 16 - Bernardon Proposal-Lindenwold Fire Department
P. 16
www.bernardon.com
Compensation
Bernardon proposes to complete the Basic Services Bernardon proposes to complete the Optional
outlined herein for a lump sum fixed fee as follows: Services outlined herein for a lump sum fixed fee as
follows:
Phase I - Visioning and Programming
Bernardon $ 2,000.00 Optional Service 01: Construction Cost
Estimating
Phase II - Schematic Design We propose to complete these services on a lump
Bernardon $ 33,000.00 sum, fixed fee basis. We recommend an allowance
MacIntosh Engineering $ 2,000.00 of $9,000.00 to $12,000.00 account for the value of
McHugh Engineering Associates, Inc. $ 7,000.00 these services.
Phase III - Design Development Optional Service 02: Exterior Pad-Mounted
Bernardon $ 43,000.00 Emergency Generator
MacIntosh Engineering $ 4,000.00 McHugh Engineering will complete this Optional
McHugh Engineering Associates, Inc. $ 12,000.00 Service on a lump sum, fixed fee basis in the amount
of $3,250.00.
Phase IV – Construction Documents
Bernardon $ 70,000.00 Optional Service 03: Survey and Site
MacIntosh Engineering $ 12,000.00 Engineering
McHugh Engineering Associates, Inc. $ 16,000.00
Bohler Engineering will complete this Optional
Service in accordance with their proposal attached
Phase V – Bidding hereto as Exhibit A.
Bernardon $ 8,000.00
McHugh Engineering Associates, Inc. $ 1,000.00
Optional Service 04: Subsurface Utility
Investigation
Phase VI – Construction Contract Administration
Bernardon $ 56,000.00 Bohler Engineering will complete this Optional
MacIntosh Engineering $ 2,000.00 Service in accordance with their proposal attached
McHugh Engineering Associates, Inc. $ 11,500.00 hereto as Exhibit A.
Optional Service 05: Geotechnical Investigation
and Estimated Seasonal High Groundwater
TOTAL BASIC SERVICES $279,500.00
Evaluation
Bohler Engineering will complete this Optional
Service on a lump sum, fixed fee basis in accordance
with their proposal attached hereto as Exhibit A.
BERNARDON | Proposal for Professional Design Services
Lindenwold Fire Department | October 21 2020 Page 12