EXHIBIT A

                                                                            Contract for Professional Engineering Services
                                                                                             Paul Sgroi - Bernardon
                                                                                           BENJ File No. JM200913
                                                                                                 October 19, 2020
                                                                                                    Page 3 of 16



                          •   Conceptual Site Plan to depict the total site-yield analysis and refinement plan relative to
                              information procured from the current survey; a detailed zoning analysis; a site review;
                              coordination and pre-review with additional jurisdictional entities including the municipality.

                          •   Finalization of a permitting critical path which will identify the applicable permits anticipated
                              for the project and an estimate of the associated time frames and event prerequisites for
                              each permit.

                          •   Coordination and virtual meetings with the project team is included in this phase as we
                              expect one on site meeting with the Fire Department will be necessary to evaluate the
                              needs and desired layout of the new Fire Station.


               Phase 2 – Design Development

               This phase will include the preparation of the design documents and permitting necessary to take the project
               through the municipal land use approval process and also obtain outside agency approvals associated with
               County Planning Board, Soil Erosion District, Local Utilities, and NJDEP as applicable.  This phase also
               includes project meetings, public hearing attendance and exhibit preparation.


               PHASE 2A – Design Document Preparation:

                       Upon authorization from your office, we will proceed with the next phase based on the concept
               sketch produced from Phase 1  above.  This phase will include preparation of the site plan documents
               required for submittal to municipal, county, state, and other applicable jurisdictional permitting entities for
               review.  Specifically, based on our knowledge of the work scope at this point, coupled with our previous
               experience in the Borough of Lindenwold, the site plan documents will be comprehensive of the following
               information:

                       A.  Site Plan and Area Map – This will include preparation of a regional area map, zoning review
                          and  analysis,  key  map  locating  the  parcel  with  respect  to  its  position  in  the  community,
                          delineation of the primary building structures, parking, access drives, and overall dimensional
                          analysis  for  the  proposed  structures  planned  for  the  project.    This  document  will  typically
                          illustrate  the  prominent  site  features  proposed  by  the  project  and  their  relationship  to  the
                          surrounding site conditions.

                       B.  Grading,  Drainage  and  Utility  Plan  –  This  will  identify  existing  topographic  and  utility
                          information as derived from the survey documents.  Utilizing this information as a base, this
                          plan will depict the proposed grading, drainage, and stormwater management characteristics
                          for this facility.  This information will be displayed with topographic and spot elevation details
                          as required to sufficiently  describe the proposed improvements.  Additionally, this plan  will
                          illustrate locations of the utilities in a plan view (including sanitary sewer, storm sewer, gas,
                          water, and electric services) for the subject site.  Storm and sanitary sewers will also be located
                          with depth below grade and sizing.  For purposes of this Contract, we have assumed that all
                          utilities are available in the immediate right-of-way contiguous to the parcel.  Also included in
                          this phase will be the display of various grading-related details including minor retaining walls
                          (1’ to 3’ in height), stormwater detention facilities, sloped areas, and topographical features
                          associated with the site’s drainage design and characteristics.  Also included will be the design
                          for the anticipated stormwater detention facility, along with the preparation of a design report
                          including storm pipe capacity computations for on-site pipes.