                                                                            Contract for Professional Engineering Services
                                                                                             Paul Sgroi - Bernardon
                                                                                           BENJ File No. JM200913
                                                                                                 October 19, 2020
                                                                                                    Page 4 of 16



                          Please  be  advised  that  the  New  Jersey  Department  of  Environmental  Protection  (NJDEP)
                          stormwater management regulations (7:8  – Stormwater Management) require applicants to
                          evaluate pre-development and post-development runoff rates from a particular parcel, and also
                          require applicants to accommodate groundwater recharge and much more stringent Water
                          Quality Standards utilizing Best Management Practices (BMPs).  In addition, these regulations
                          require an extensive amount of effort with respect to preparing the appropriate design.  These
                          requirements  necessitate  additional  geotechnical  evaluations  to  determine  infiltration  rates,
                          seasonal high groundwater elevations, etc.

                          These regulations are immediately applicable when an application requires NJDEP review.
                          Based on our knowledge of the site, it appears that this application will not require NJDEP
                          review, and therefore provisions to design the stormwater management systems in accordance
                          with these regulations are not included herein.  If our due diligence investigation, or directives
                          from the municipality, indicate that adherence to the stormwater regulations will be required, a
                          revised contract will be submitted for your authorization.

                       C.  Lighting Plan – This plan will identify the proposed lighting improvements as planned for the
                          subject  facility.    Generally,  the  lighting  fixtures  will  be  displayed  with  respect  to  their  plan
                          location, photometric influence, height and specifications for purposes of construction.  This
                          plan will generally conform to accepted industry standards with respect to illumination levels,
                          as well as criteria that may be pertinent as offered by the client and municipality.  This plan
                          may be further enhanced at your request to illustrate a digitized grid of the illumination levels.

                       D.  Landscaping Plan – This plan will illustrate the proposed landscape improvements for this
                          facility.  This will be reflected graphically on the landscape plan for the proposed landscape
                          improvements  inclusive  of  trees,  shrubs,  related  plantings  and  associated  landscaping
                          items.  The design will be superimposed onto the site plan documents and will ultimately be
                          utilized  for  construction.   Additionally,  on  this  plan,  our  office  will  incorporate
                          landscape installation  details  and  specifications.   Furthermore,  our  office  will  provide
                          a Landscape Schedule which identifies, per individual species, the common name, botanical
                          name, quantity and proposed installation size.

                       E.  Construction Details – This plan will be utilized in concert with previous documents and will
                          display some of the prominent detailing proposed for this project.  This may include details of
                          drainage facilities, manholes, signage, utility details, and related site features as proposed.
                          Stormwater  structures,  manholes,  etc.,  are  assumed  to  be  pre-cast  concrete,  and  related
                          structural engineering design shall be provided by the precise manufacturer.

                       F.  Soil  Erosion/Sediment  Control  Plan  –  This  plan  includes  the  interim  soil  stabilization
                          methods to be utilized during construction, including wheel cleaning blankets, outlet protection,
                          silt  fences,  hay  bale  protection,  sediment  basins,  seeding  specifications,  and  related  site
                          features  as  required  by  the  county  soil  conservation  district  for  minimization  of  sediment
                          transport from this property.

               PHASE 2B – Agency Permitting:

                       This  phase  will  include  assistance  toward  preparation  and  completion  of  application  forms  for
               various jurisdictional agencies during the application process to the outside agencies.

                   A.    Assistance toward preparation of Borough of Lindenwold Planning Board Application – This
                         phase  will  include  providing  your  office  and  attorney  with  the  appropriate  documents,