Page 40 - Bernardon Proposal-Lindenwold Fire Department
P. 40

EXHIBIT A

                                                                            Contract for Professional Engineering Services
                                                                                             Paul Sgroi - Bernardon
                                                                                           BENJ File No. JM200913
                                                                                                 October 19, 2020
                                                                                                    Page 5 of 16



                         calculations,  and  information  necessary  to  complete  the  forms  for  submission  to  the  county
                         planning board.

                   B.    Completion  and  submission  of  a  Soil  Erosion/Sediment  Control  Plan  Application  –  This
                         phase includes the completion of the application forms, calculations, design, engineer’s report,
                         correspondence, and submission to the county soil conservation district toward certification of
                         the Soil Erosion/Sediment Control Plan.  As previously discussed, this will be utilized for soil
                         stabilization during the construction process and will govern the activities of the site during this
                         period.


                   C.    Completion and submission of a Request for Authorization (RFA) Form in accordance with
                         NJPDES General Permit for stormwater discharge associated with construction activity.  This
                         application and notification is required for construction of sites greater than one (1) acre and will
                         be completed in coordination with the county soil conservation district certification.

                   D.    Sanitary Sewer and Water Connection Applications – This phase will include preparation of
                         the  municipality-required  application  forms,  calculations,  correspondence,  mailings,  follow-up
                         with  local  sewer  and  water  agencies,  preparation  of  engineer’s  reports,  and  Project
                         Specifications.  Preparation of surveyed as-builts is not included.

                   E.    Assistance toward preparation of County Planning Board Application – This phase will include
                         providing your office and attorney with the appropriate documents, calculations, and information
                         necessary to complete the forms for submission to the county planning board.


               PHASE 2C – Project Management and Project Meetings:

                       This phase shall include the requested project management efforts of Bohler Engineering, inclusive
               of  miscellaneous  client  correspondence,  conference  calls,  strategy  discussions,  and  coordination  with
               attorney, architect, and other team members as necessary.  Such services will be provided on a time and
               material basis in accordance with our rate schedule. Meetings with the project team and/or jurisdictional
               agencies, when requested, will be provided as needed on a time and material basis and will be charged
               portal to portal.

               PHASE 2D – Public Hearing:

                       This phase includes our attendance, and presentation of the project, at a municipal board hearing.
               Attendance  of  evening  hearings  will  be  charged  on  a  time  and  material  basis,  or  $750  minimum,  per
               professional, per evening, plus preparation time.  (Preparation time shall include, but is not limited to:  review
               of transcripts, review of reports by the Board’s professionals, review of renderings/exhibits, review and
               discussion of possible plan changes to address Board’s/Board’s professionals’ comments, review of notes
               from prior hearings, consultation with the project team, review of testimony with the project engineer, etc.)
               Meetings held during the day, including pre-hearing meetings, will be invoiced on a time and material basis
               in accordance with our rate schedule.

               PHASE 2E – Renderings and Exhibit Preparation:

                       A color version of the project site plan will be provided for use as an illustration before the Board
               and to enhance clarity during testimony. In addition, an existing condition Aerial Exhibit plan will be prepared
               to describe the existing site conditions.


                                                    www.BohlerEngineering.com