               PHASE 2F – Revisions and Post-Approval Administration:

                       Revisions are often required based on comments and requirements of the various agencies or your
               office, upon your prior approval, additional revision fees will be billed hourly in accordance with our hourly
               fee schedule.  These revisions are often disclosed as a result of the first hearing, or receipt of jurisdictional
               agency comments.  The revision fees can range from a few thousand dollars (minor Site Plan comments)
               to  several  thousand  dollars,  depending  on  the  magnitude  of  the  revisions  required.    It  has  been  our
               experience in New Jersey that, due to the sensitive zoning nature of most projects, a revision fee of a few
               thousand dollars can be expected.




               Phase 3 – Construction Documents

               This phase will include the preparation of Construction Documents for bidding and final coordination with
               the project Architect for preparation of the construction ready documents.

                       A.  Construction Document Preparation – Upon receiving final site plan approval and prior to
                          construction,  the  site  plans  will  be  enhanced  with  additional  topographic  information  and
                          thoroughly  reviewed  for  compliance  with  architectural  elevations  and  floor  plans  and
                          embellished  with  additional  contractor  directives  to  assist  in  clarifying  construction
                          responsibilities.    The  construction  plans  will  then  be  comprehensive  of  the  information
                          necessary  for  submittal  to  contractors  for  preliminary  bid  requests.    Typically,  construction
                          plans submitted for final bid would be accompanied by project specifications.  These can be
                          prepared upon request but are not included as part of this project phase.

                       B.  Construction Trailer Plan – Our office will assist in the preparation of necessary applications
                          and the Construction Trailer Plan to be submitted to the municipality for approval.  This plan
                          will  be  prepared  in  AutoCAD  format  based  on  information  provided  to  our  office  by  the
                          contractor identifying the desired location of said trailer.  Upon receipt of the approved location,
                          the necessary documents will be forwarded to the municipality for approval.

                       C.  Construction  Bonding  Estimates  –  Within  this  phase,  Bohler  Engineering  proposes  to
                          prepare a construction bonding estimate, or “Opinion of Probable Cost” calculations, for use by
                          the client for performance guarantee and escrow determination with the municipality.  Should
                          detailed construction cost estimates be required, a supplemental contract can be provided.


               Phase 4 – Bidding

               In this phase of the work, Bohler will provide assistance during the bidding process with respect to the site-
               related improvements.  These services include:

                       •   Attending a pre-bid meeting to convey the project conditions and improvements to the bidding
                          GC’s;
                       •   Responding to requests for information (RFIs) from bidders;
                       •   Assisting in interpreting bids and/or pricing, including bid leveling;
                       •   Reviewing bids to determine value-engineering suggestions.