savings, as well as detailed planning and engineering information to reduce pumping costs;
         realized $75,000 in annual savings.
         · Company - wide Work Order System : Developed and implemented system to track maintenance
         and production costs and labor. Reduced average crew time to repair main break from 8 to 5
         hours
         · Preventive maintenance system : Standardized equipment numbers work codes and
         maintenance schedules to reduce vehicle down time by 20%.
         · Design specification: Established company-wide design standard for water line specification and
         drawing details

         · Crew Chief Procedures: Developed operations manuals for water line maintenance, main repair,
         traffic control, safety shoring and documenting reporting.Increased work site safety and efficiency
         · Water Quality Department: Instrumental in developing water quality department, establish
         workload and personnel requirements.
         · Mobile Communication: evaluated field communication system for direct communication with
         field personnel to facilitate timely information.
         · Water treatment plant operation Manual: promoted safety practices, daily routine, best practices
         and chemical safety procedures for consistent high quality operations.Initiated related training
         programs.


         EDUCATION AND TRAINING

         Bachelor of Science
         Engineering, Widener University, Chester Pennsylvania


         CERTIFICATIONS

         LICENSES retired
         New York State Professional Engineer
         Pennsylvania Professional Engineer



         ADDITIONAL INFORMATION
         Affiliations
         American Water Works Association
   25   26   27   28   29   30   31   32   33   34   35