Ryan T. Moore PE, TE



                         Project manager for the feasibility study, preliminary design, and environmental
                         clearance  of  an  alternative  modes  bridge  over  UPRR  and  SacRT
                         facilities.   Project  required  coordination  with  multiple  public  and  private
                         stakeholders, significant utility relocation, and extensive public outreach.

                         Coordinator for Sacramento Housing & Redevelopment Agency (SHRA)
                         Capital Improvement Projects 2006 – 2012
                         Extensive coordination with SHRA to identify transportation infrastructure needs
                         and initiatives which aligned with redevelopment priorities. Advisory role in the
                         programming  of  Tax  Increment  and  Community  Development  Block  Grant
                         resources.    Frequent  presentations  to  various  Redevelopment  Technical
                         Advisory  Committee’s  regarding  project  status  and  general  transportation
                         infrastructure  policy.  Partnering  for  grant  applications.  Scoping  and  project
                         initiation for redevelopment infrastructure projects.

                         Dixieanne Green Street, City of Sacramento, CA
                         Managed  preliminary  engineering  and  environmental  clearance  phase  for  a
                         project to construct the first ever “Green Street” in the City of Sacramento.  The
                         project  involved  extensive  utility  coordination,  right  of  way  acquisition,  and
                         coordination  with  the  City’s  Department  of  Utilities  to  establish  new  design

                         procedures for bioswale drainage.

                         Transportation Programming Guide (2008 – 2013)
                         Program  Manager  for  the  production  of  the  bi-annual  Transportation
                         Programming Guide (TPG), a project prioritization document designed to inform
                         decisions  about  funding  priority  for  transportation  CIP’s.    Included  bi-annual
                         evaluation of project ranking criteria, outreach to stakeholder departments and
                         organizations,  council  approval  or  re-validation  of  selection  criteria,  project
                         ranking,  and  ultimate  presentation  to  City  Council  for  approval  of  the  final
                         document.

                         Delta Park Light Rail Extension, Portland, OR
                         Construction management/inspection for TriMet’s IMAX light rail extension to
                         Delta Park.  The project entailed over 3,800 feet of aerial structure and 2,500
                         feet of new at grade rail.  Assignment involved girder placement, placement of
                         cathodic deck protection and deck reinforcement, foundation construction, and
                         MSE wall construction.

                         Third Street Bridge over the Napa River, Napa, CA
                         Project engineer for an HBP replacement of a bridge structure over the Napa
                         River as part of the USACE $238M Napa River Flood Protection Project directed