Medical Lubricated Vacuum
3B.0 Start Up - Basic Controls
Note: This section applicable to Lubricated should be approximately 70°F (21.1°C) with a
Rotary Vane Medical Vacuum Systems with the minimum ambient temperature of 40°F (4.4°C)
Basic control system. and a maximum ambient temperature of 105°F
(40°C).
3B.1 Prestart-up
• Check the intake piping for proper size and
The contractor should notify BeaconMedæs connection to the vacuum modules.
two weeks prior to start-up date to schedule an
appointment for an authorized technician to • Check all piping system joints that might have
review the installation prior to start-up. come loose during shipment and installation
to ensure they are tight.
CAUTION: Failure to install the unit properly and
have an authorized technician from BeaconMedæs • Check the air receiver, controls, and pumps for
start-up the system can void the manufacturer’s damage.
warranties.
• Check the drain valve on the air receiver.
WARNING: • Check all valves for full open and full close
Prior to putting the LifeLine® Lubricated travel. Ensure that the system’s valves are
Rotary Vane Medical Vacuum system positioned for proper operation. (Refer to
into use, the medical facility must have a labeling on valve handles)
Certifi er perform all installation tests as
specifi ed in NFPA 99. The medical facility • Remove all packing material from the
is also responsible for ensuring that the unit.
Medical Vacuum meets the minimum
requirements for Medical Vacuum as • Check the electrical connections to the control
specifi ed in NFPA 99. cabinet.
• Verify electrical service. Before starting the
Prestart-up and start-up procedures should be system, check to see that voltage, amperage,
performed for a new installation or when major and wire size are appropriate.
maintenance has been performed.
CAUTION: Electrical service must be as specifi ed
or damage to equipment may occur.
WARNING:
Have more than one person on hand during WARNING:
prestart-up and start-up procedures to
ensure safety and to facilitate certain To prevent electrical shock, ensure that
checks. ALL electrical power to the system is OFF,
including the disconnect switches and
Automatic-Off -Manual switches on the
The main power source to the control panel should control panel. The facility’s supply circuit
be OFF for the duration of the visual inspection. breaker should also be locked out.
Ensure that the equipment is installed on a solid
level surface. Walk around the system to ensure that • Open the electrical cabinet by loosening the
there is enough clearance on all sides to perform fasteners on the front.
operational checks/actions and maintenance. The
temperature of the area containing the modules
3B-1 4107 9000 96.03