Page 15 - Zavation Z-Direct Lumbar System with DSG Tech Booklet - Hensler 2019
P. 15

Compression/Distraction:
                                                           After the construct has been assembled, segmental
                                                           compression and distraction may be carried out using
                                                           the Compressor/Distractor.










                                                           Final Tightening:
                                                           The final tightening will consist of the Counter Torque
                                                           Wrench and T-Handle Torque Wrench Driver. Insert the
                                                           Counter Torque Wrench over the rod and screw head,
                                                           while the T-Handle Torque Wrench engages the set
                                                           screws. Rotate the T-Handle Torque Wrench Driver until
                                                           the limit driver produces an audible and tactile click
                                                           indicating final tightening is achieved. The torque limit is
                                                           set to click at 12 N-m (106in-lbs).






                                                           Extended Tab Removal:

                                                           After rods and set screws are in place, the extended
                                                           tabs can be removed from the screw heads. These are
                                                           removed by squeezing the top of the screw until the
                                                           bridge fractures at the top.  After the bridge is
                                                           separated, insert the Tab Remover with one tab
                                                           engaged until the ball end engages the set screw. Rock
                                                           the tab back and forth until the tab separates.  Repeat
                                                           this process for the second tab.







                Squeeze to break
                top bridge








                                                           DCR 234                                ST-002 Rev 4
                                                                                                 Page 10 of 39
   10   11   12   13   14   15   16   17   18   19   20