Page 119 - ASBIRES-2017_Preceedings
P. 119

th
                     Proceedings of the 9  Symposium on Applied Science, Business & Industrial Research – 2017
                     ISSN 2279-1558, ISBN 978-955-7442-09-9

                          Identification of Factors Affecting for Delaying Water & Waste Water
                          Treatment Plant Construction Projects: A Case Study of a Sri Lankan
                                                              Company

                                        Nimasha BGBS, Dharmawardane PMN, Appuahamy PADAN
                                      Department of Mathematical Sciences, Wayamba University of Sri Lanka
                                                        nimashabgbs91@gmail.com
                                                             ABSTRACT


                            Construction  delays  highly  affect  the  good  will  of  company  and  it  is  a  major
                     problem  in  construction  industry.  Sri  Lanka  has  new  trend  for  water  and  waste  water
                     treatment.  The  main  objective  of  this  study  is  to  identify  major  causes  for  construction
                     delays and methods of minimizing delays. A questionnaire, based on the Likert scale, was
                     developed to carry out this research to measure the delayed reasons for the delay against
                     the number of delayed days. Data was collected under ten factors for delaying water and
                     waste water treatment plant construction projects. Those are delayed at mobilization stage,
                     agreement  preparation  delays,  payment  delays,  local  material  purchasing  delays,
                     unavoidable  issues,  planning  processes,  import  delays,  clients’  problems,  communication
                     problems and installation delays. Regression analysis was used to identify the significant
                     factors for the delay in water and waste water treatment plant construction projects. This
                     study revealed that delaying at mobilization stage, unavoidable issues, import delays and
                     installation  delays  were  the  significant  impacts  on  delays  in  construction.  Therefore
                     preparation  of  proper  plan  to  purchase  materials  and  chemicals  and  to  utilize  existing
                     resources and introduction of rewarding system for the employees would help to reduce
                     such delays to some extent.


                     KEYWORDS: Construction delays, Waste water treatment, Water treatment

                                1 INTRODUCTION                              Inspection of water for drinking purpose
                                                                       is  called  water  treatment  which  is  done
                         Water  treatment  (WT)  and  wastewater
                     treatment (WWT) is the part of total water        using  different  kinds  of  filtration  systems
                     management.  They  come  under  service           like  multimedia,  softener  and  activated
                     industry  in  Sri  Lanka  even  though  it  is    carbon  filters,  reverse  osmosis,  ultra-
                     mostly related to the construction industry.      filtration  systems  and  ozonator  systems
                                                                       according  to  quality  of  raw  water.  On  the
                          Lack of pure water due to droughts and       other   hand,    waste    water   treatment
                     due  to  other  enviromental  problems,  it  is   technology    includes    chemical-physical
                     important  to  think  of  establishing  these     treatment  systems,  and  biological  aerobic
                     industries  which  are  rare  at  present  in  Sri   and   anaerobic   systems.   In   getting
                     Lanka.  Waste  is  one  of  the  major            International       Organization         for
                     environmental problems and threaten all the       Standardization  (ISO)  standards  to  a
                     living beings. Low quality of drinking water      company, wastewater treatment is one of the
                     is  also  a  major  problem  in  districts  like   key factors.
                     Jaffna,     Anuradhapura,      Kilinochchi,
                     Polonnaruwa,  Vavuniya,  Puttalam  and                 These two treatments help to implement
                     Kurunagala.  Due  to  drinking  contaminated      environmental  standards  and  to  continue
                     water,  most  of  the  health  problems  have     waste  management  for  different  kinds  of
                     frequently    occured    to    people    in       industries  and  organizations.  In  Sri  Lanka
                     aforementioned areas. In future this industry     both water and waste water treatment plant
                     may  be  the  most  popular  construction         construction    projects   follow    similar
                     industry.                                         procedure  to  analysis  and  treat  water.



                                                                    109
   114   115   116   117   118   119   120   121   122   123   124