Page 21 - Barr&Barr_Technical Proposal
P. 21
Contractor Performance
Evaluation
Project Information
Rutgers University - Chemistry & Chemical Biology Building
Project Name: Date Of Evaluation 8.04.2017
Project Number Evaluators; Majid "Maj" Fanik, VP, Lendlease US Construction Inc.
15-522
Owner Representative for Rutgers University
Project Team Chuck Tatosian (SPM) Brooke Rodgers (MEP PM) Wilton Marto (PM)
Campus
New Brunswick, NJ
Project Start Date Substantial Completion November 2017
Nov-15
Contractor Prequalification Status_________________Prequalified
Barr & Barr, Inc.
81,000,000.00
Original Contract Amount $ Total Change Order Amount ($196,000)
Contractor Project Manager Brooke Rodgers (MEP PM) Wilton Marto (PM) Initial Evaluation_____
Chuck Tatosian (SPM)
Contractor Superintendent Final Evaluation_____
Steve Goodwin
Type Of Contract
Prime Contractor___ Subcontractor___ Construction Manager x
Project Comments/Description
This new four story (above grade) Chemistry and Chemical Biology, with a basement and penthouse, will house classrooms, administration offices, research
laboratories and a 120 seat auditorium. The lobby doubles as a presentation and gathering space and the basement includes specialty imaging facilities.
• The structure consists of a concrete wide module joist system and includes architecturally exposed concrete at laboratories, stairways and other interior
locations. The mechanical penthouse has steel framing members.
• The ground floor houses flexible classrooms, administration offices and a 120 seat auditorium. The lobby doubles as a presentation and gathering space.
• Research laboratories and related office on three upper floors include synthetic organic and inorganic chemistry; physical organic and analytical chemistry; and
physical, biological and materials chemistry.
• Shared specialty imaging facilities are located in the basement. Specialized environmental requirements include EMI mitigation, vibration isolation, acoustics,
and temperature and humidity control.
• Air handlers, energy recovery units and exhaust fans are located at the penthouse level. Plumbing and electrical systems are located in the basement
• The project is targeting LEED Gold Certification
• Sitework includes bio-retention area, regrading, utility relocation, paving, restriping of existing surface parking, and exterior lighting
The Exterior Envelop materials include curtainwall, terracotta rain screen, composite metal panel, precast and dimension stone cladding.
Page 1 of 5