             putting in place, properly laid out roads and creating
             road space for pedestrians and cyclists. The design
             philosophy is based on connecting busy places of the
             city but avoiding busy roads: for example, the first
             corridor  was  on  a  road  with  a  width  of  40m  and
             manageable  traffic  volumes  of  3000-  6000  PCU's
             along most stretches and of 6000-9000 PCUs along
             a few stretches.





                                                                    Figure 4 Janmarg BRTS station

                                                              4. Study Area

                                                              The area selected was Narol Naroda BRTS corridor










                  Operational	 BRT	 network
                  Proposed	BRT	 network	  Source:	 CEPT	 university

                   Figure 3 Ahmedabad BRTS network

                 The  BRT  system  has  an  operational  network
             length of 96 km in length (CEPT). It has 10 routes   Figure 5 Study Area Narol- Naroda Corridor
             and 230 buses (2015) (CEPT). The transit system has
             brought about a change in the way people travelled
             in Ahmedabad. The project has given Ahmedabad a
             global spotlight and place on the map.  It has also
             won  various  Accolades  and  appreciation  for  the
             implementation of sustainable BRTS Operation on   in  western  Ahmedabad.  It  is  the  busiest  BRTS
             Global    and   International   level.   (AMC,   corridor  in  Ahmedabad,  in  terms  of  boarding  and
             http://www.ahmedabadbrts.org/web/About_JanMar    alighting. (CEPT) It is a 13.2 km stretch and it shares
             g.html). The project has a first phase of 58.3 km, of   the ROW with NH-8 which passes through the area.
             which  44.5  km  have  been  completed.  The  BRT   The area is known for its industries and also has the
             system carried 140,000 trips13 every day in 2011,   highest number of bicyclists. The other major modes
             with an average trip length of 8.7 km.           in  the  area  are  Auto  rickshaws,  2  wheeler  motor
                                                              bikes, cars and freight vehicles.

                                                              The  NMT  tracks  and  pedestrian  footpaths  are

                                                              present in many parts which was not the case before
                                                              the  introduction  of  BRTS.  However,  the  NMT
                                                              infrastructure is not complete in the whole stretch.
                                                              Many  parts  of  the  corridor  ha  non-  continuous
                                                              bicycle tracks. The roads are of comfortable width.