Page 512 - Facilities Master Plan 2016
P. 512

Lodi Unified School District                                            Lodi Unified School District
          Beckman Elementary School                                               Beckman Elementary School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                          Project Cost Summary (2016$) - Beckman Elementary School               Project Cost Summary (2016$) - Beckman Elementary School
                                                       Construction Costs   Total Project                                     Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
            11d Learning Center
            11d.3 Modernize Learning Center                   704 sf  $             119.00 $              84,000  17 Technology Infrastructure  $                 32,000 $                      32,000
            11d.4 Reconfigure Learning Center                   960 sf  $             237.00 $            228,000   17c MDF and IDF data rooms with environmental control
                                                                                   (direct cost only)                             1 ea  $       32,000.00 $              32,000
          12 Safety, Security & Campus Control             $           1,578,000 $                 2,099,000
            12b Safety improvements to and/or new parent/bus drop-off areas and parking  Total Construction/Project Cost (2016$)  $         23,365,000  $30,941,000
            12b.1 New Parking Lot              20,625 sf  $               16.00 $            330,000
            12b.3 Entry Plaza                     2,100 sf  $               26.00 $              55,000
            12b.5 New Drop-off Area             10,350 sf  $               18.00 $            186,000  The following items are excluded from this budget:
            12b.9 Repair existing Parking Lot             29,725 sf  $                 6.30 $            187,000  Utility hook-up fees & City connection fees.
            12b.11 New concrete walkways                4,250 sf  $               15.00 $              64,000  Offsite work and traffic signals.
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000  Land acquisition costs.
            12e Safety locks at classroom doors                     40 ea  $             449.00 $              18,000  Hazardous material surveys, abatement, and disposal.
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000
            12h Fencing with controlled campus entrances
            12h.2 Decorative Metal Fencing & Gates                   375 lf  $             252.00 $              95,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             34,664 sf  $                 5.40 $            187,000
            12i.2 Emergency Lighting             34,664 sf  $                 1.40 $              49,000
            12j New public address/emergency communication
            systems                            34,664 sf  $                 7.60 $            263,000
            12k Intrusion alarms               34,664 sf  $                 1.80 $              62,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $              268,000 $                    356,000
            14a Main Student Quad
            14a.2 New Main Student Quad                9,800 sf  $               19.55 $            192,000
            14b Learning Courts
            14b.2 New Learning Court                3,300 sf  $               23.00 $              76,000
           15 Exterior Play Spaces, Playfields & Hardcourts  $              810,000 $                 1,077,000
            15a Kindergarten Play Yard
            15a.1 New Rubberized Surface Play Area                1,500 sf  $               20.00 $              30,000
            15a.3 Shade Structure                 1,200 sf  $               90.00 $            108,000
            15a.6 New Hardcourts                  5,450 sf  $               11.00 $              60,000
            15a.7 Slurry Coat & Stripe Existing Hardcourts                4,800 sf  $                 3.00 $              14,000
            15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                5,200 sf  $               20.00 $            104,000
            15b.7 Slurry Coat & Stripe Existing Hardcourts             64,100 sf  $                 3.00 $            192,000
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       25,333.33 $              25,000
            15c Playfields
            15c.1 Repair Playfields             92,350 sf  $                 3.00 $            277,000
           16 Next Generation Classroom Flexibility (Furniture)  $              375,000 $                    375,000
            16a Flexible furniture (Per Classroom, Direct Cost)                     25 ea  $       15,000.00 $            375,000


         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.2       APPENDIX                                                                                                    Facilities Master Plan  483
                   DETAILED COST ESTIMATE                                                                                  Lodi Unified School District
   507   508   509   510   511   512   513   514   515   516   517