Page 88 - Facilities Master Plan 2016
P. 88
Adequate restrooms for student and staff shall be CUSTODIAL
placed in various locations throughout the campus.
Restroom finishes shall be durable, easily cleanable
and maintainable.
Restroom locations and plumbing fixture counts
should meet code requirements as well as the
following requirements:
Floors / Walls: Ceramic / porcelain tile; slope to drain
tile floors with trap primers; Tile walls to top of door
height.
Ceiling: Painted gypsum board.
Casework: No counter tops at student
restrooms.
Equipment and Accessories: Solid phenolic
partitions, floor and wall mount.
Single mirror per each lavatory.
Soap dispensers at each lavatory. Paramount High School
Women’s restrooms to have napkin dispensers and
napkin disposal (staff); MS & HS (staff and student).
Men’s & Women’s staff stalls to have toilet seat cover
dispensers.
Electric hand dryers (student). Custodial closets shall be placed in various locations throughout the campus for
Paper towel dispensers (staff). convenience of maintenance staff to access equipment and supplies.
Electrical: Dedicated circuit to GFI receptacles.
Plumbing: Recessed hose bib with locking cover. Floors: Sealed concrete.
Clean out above all urinals. Hot and cold water at all Walls: FRP panels (minimum height to top of faucet), painted gypsum board.
lavatories / sinks, per code. Ceiling: Painted gypsum board.
All restrooms to have ball valve shutoff (in recessed Equipment and Accessories: Shelving with 4 foot depth. Mop and broom hangers.
areas provide access panel). Electrical: Dedicated circuit to GFI receptacle.
Low flow plumbing fixtures. Plumbing: Hot and cold water at sinks. All electrical fixtures, sprinklers, etc. protected by metal
1 pint urinals. cage.
RESTROOMS
EDUCATIONAL VISION DOCUMENT 46
3.1 SITE ELEMENTS Lodi Unified School District
Facilities Master Plan