Page 9 - Airstream™ Series Dryer
P. 9
AIRSTREAM™ SERIES DRYER
Introduction
Before You Get Started
Requirements for installation
hammer drill with 5/8” (16 mm) bit 25 foot (8 meters) extension cord
tape measure (25 foot [8 meters] or greater) tin snips
level / plumb line safety glasses
miscellaneous hand tools work gloves
fork lift, 5000 lb. capacity (2268 kg) ladder
large “C”- clamps three phase electricity
2 CFM @ 90 PSI (6.21 BAR) compressed air single-phase @ 3 amp
(Pro Airstream™ Dryer)
Equipment included Qty
Airstream™ Dryer:
Head frame assembly 1
Top nozzle assembly 1
Support Legs 2
High Side nozzle assembly (depends on purchase) -
Low Side nozzle assembly (depends on purchase) -
Flow Cell™ nozzle assembly (depends on purchase) -
Photo eye tree assembly 1
(Pro Airstream™ Dryer)
Tie bar assembly 2
Top Nozzle Hose kit
Top nozzle hose 70” (177.8 cm) 1
Stainless steel ring clamps (depends on purchase) 2
Pivot arm assembly 1
Impellers (depends on purchase, see impeller section) -
Accessory box 1
DISCONNECT AND LOCKOUT ELECTRICAL POWER BEFORE SERVICING ANY
EQUIPMENT!
CAUTION
Always wear safety glasses when performing maintenance on any equipment
1MANUL021 Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 7