Page 9 - Airstream™ Series Dryer
P. 9

AIRSTREAM™ SERIES DRYER

                       Introduction



                       Before You Get Started


                              Requirements for installation
                                  hammer drill with 5/8” (16 mm) bit                 25 foot (8 meters) extension cord
                                  tape measure (25 foot [8 meters] or greater)       tin snips

                                  level / plumb line                                 safety glasses
                                  miscellaneous hand tools                           work gloves
                                  fork lift, 5000 lb. capacity (2268 kg)             ladder
                                  large “C”- clamps                                  three phase electricity
                                  2 CFM @ 90 PSI (6.21 BAR) compressed air           single-phase @ 3 amp
                                                                                     (Pro Airstream™ Dryer)


                              Equipment included                                    Qty

                                 Airstream™ Dryer:
                                  Head frame assembly                                1
                                  Top nozzle assembly                                1
                                  Support Legs                                       2

                                  High Side nozzle assembly (depends on purchase)    -
                                  Low Side nozzle assembly (depends on purchase)     -
                                  Flow Cell™ nozzle assembly (depends on purchase)   -
                                  Photo eye tree assembly                            1
                                  (Pro Airstream™ Dryer)
                                  Tie bar assembly                                   2
                                  Top Nozzle Hose kit
                                   Top nozzle hose 70” (177.8 cm)                    1
                                   Stainless steel ring clamps (depends on purchase)   2
                                  Pivot arm assembly                                 1

                                  Impellers (depends on purchase, see impeller section)   -
                                  Accessory box                                      1




                                 DISCONNECT AND LOCKOUT ELECTRICAL POWER BEFORE SERVICING ANY
                                                                EQUIPMENT!


                                                            CAUTION

                                      Always wear safety glasses when performing maintenance on any equipment





                        1MANUL021          Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        7
   4   5   6   7   8   9   10   11   12   13   14