Page 118 - FreesStyler® Installation and Startup
P. 118

®
            INSTALLATION AND STARTUP


            Chapter 6 Undercarriage


            Undercarriage Above-Ground Placement

             Actual placement or tunnel depth  may  vary  according to preference, tunnel space available or
              system configuration Assembly


            Undercarriage Assembly
              1)  Position the Undercarriage Wash/Rust Inhibitor in the desired location. This is traditionally just before the
                 entrance leg to the first piece of equipment in the tunnel.
              2)  Position it so that the right  side of the Undercarriage Wash/Rust Inhibitor is angled towards the tunnel
                 entrance.
              3)  Once it is in its permanent location, lag it to the floor.
              4)  Plumb water feed from Undercarriage Wash valve assembly.




























































             6-6        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL220
   113   114   115   116   117   118   119   120   121   122   123