Page 184 - FreesStyler® Installation and Startup
P. 184
®
INSTALLATION AND STARTUP
Chapter 9 Optional “Add-On” Items
HydroBlade® Option
Utilities
10HP Medium Pressure Pumping Station
Electrical Requirements 10HP, 3 phase
208 @ 32 Amps
230 @ 31.5 Amps
VAC 120 @ 2 Amps constant from GFCI protected circuit side
Specified output 120V signaled
Water Requirements 1’’ @ 30 GPM @ 40 PSI
25HP Pumping Station
Electrical Requirements 25HP, 3 phase
208 @ 78 Amps
230 @ 68 Amps
460 @ 34 Amps
VAC 120 @ 2 Amps constant from GFCI protected circuit side
Specified output 120V signaled
Water Requirements 1’’ @ 30 GPM @ 40 PSI
Tools Required
3/4” wrench Two adjustable wrenches
1/16’’ Allen wrench Safety glasses
See Nozzle Chart later in this chapter for more details.
9-52 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL220