Page 184 - FreesStyler® Installation and Startup
P. 184

®
            INSTALLATION AND STARTUP


            Chapter 9 Optional “Add-On” Items


            HydroBlade® Option


               Utilities
                 10HP Medium Pressure Pumping Station
                     Electrical Requirements   10HP, 3 phase
                                        208 @ 32 Amps
                                        230 @ 31.5 Amps
                                        VAC 120 @ 2 Amps constant from GFCI protected circuit side
                                        Specified output 120V signaled


                     Water Requirements   1’’ @ 30 GPM @ 40 PSI

                 25HP Pumping Station
                     Electrical Requirements   25HP, 3 phase
                                        208 @ 78 Amps
                                        230 @ 68 Amps
                                        460 @ 34 Amps
                                        VAC 120 @ 2 Amps constant from GFCI protected circuit side
                                        Specified output 120V signaled

                     Water Requirements   1’’ @ 30 GPM @ 40 PSI

               Tools Required

                     3/4” wrench                           Two adjustable wrenches
                     1/16’’ Allen wrench                   Safety glasses


                     See Nozzle Chart later in this chapter for more details.
































            9-52        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL220
   179   180   181   182   183   184   185   186   187   188   189