Page 18 - Multi-Purpose Arch
P. 18
MULTI-PURPOSE ARCH
Installation
Main Water Feed
1) Locate the supplied barbed hose fittings and secure them into the top of the previously installed
upper Tee fitting using Liquid Teflon™. Direct plumb hydraulic hose instead of using hose-barb for
High-Pressure applications.
2) Locate the supplied foam pendant cap. Place the pendant cap and hose clamp over feed hose.
Push the hose on the barbed fitting. Tighten the hose clamp. If you have the Dual Feed Option,
secure the Pendant Cap onto the Pendant then install the Dual Feed Assembly.
Feed Hose
Hose Clamp
Barbed Hose Fitting
Before After
Nozzle Installation
1) Locate the supplied nozzles and nozzle extensions. Secure all extension into the manifolds through
the small holes in the foam covers.
2) Electrically connect water solenoid valve or other optional equipment to the car wash controller unit
(if applicable).
3) Flush system lines and manifold, then install nozzles according to the Nozzle Guide beginning on
the next page.
Note: Lubricate nozzles and extensions with a Liquid-Teflon™ (NO TAPE) for easier installation
and maintenance.
Note: Nozzle selection is dependant on application, Nozzles vary for High-Pressure, Reclaim,
Pre-Soak, Waxes and R.O.
16 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (248) 380-9681 1MANUL115