Page 15 - Hydro-Hybrid™
P. 15
HYDRO HYBRID™
Installation
Pivot Bars
Assembly
The pivot bars shown below hold the middle manifolds and nozzles. They are identical and can
be used on either side. The lower pivot bars are installed the same way. The pivot bar faces
the inside of the frame.
1) Locate the two Pivot Bars and secure them to the leg assemblies.
Pivot bar (typical)
Secure the nozzle mounts to the leg assemblies
2) The heights should be set as shown below, from retainer pin to retainer pin.
77-1/2”
Direction
Of 96”
Travel
1MANUL253 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 13