Installation
Assembly
1) Select an appropriate location for the pump station to be installed. The area should be well lighted
and have adequate room to inspect and maintain the unit.
2) Remove unit from packing crate and position into location.
3) Level the pump station in both directions by adjusting the built in leveling feet.
CAUTION
The unit being level has direct bearing on Hydrominder performance.
Horizontal Leg
Step 3a:
raise or lower this nut as on
all four mounts to level first
Step 3b:
tighten all three nuts
Floor Mount on each Floor Mount to
lock mounts into place