Page 11 - Prep Jet System
P. 11

PREP JET SYSTEM



                       Installation


                       Assembly
                              1)  Select an appropriate location for the pump station to be installed. The area should be well lighted
                                 and have adequate room to inspect and maintain the unit.
                              2)  Remove unit from packing crate and position into location.
                              3)  Level the pump station in both directions by adjusting the built in leveling feet.

                                                            CAUTION


                                   The unit being level has direct bearing on Hydrominder performance.
















                                                      Horizontal Leg



                                                          Step 3a:
                                             raise or lower this nut as on
                                              all four mounts to level first
                                                                                                Step 3b:
                                                                                                tighten all three nuts
                                                                           Floor Mount          on each Floor Mount to
                                                                                                lock mounts into place




























                        1MANUL603                             Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681                        9
   6   7   8   9   10   11   12   13   14   15   16