Page 13 - Prep Jet System
P. 13

PREP JET SYSTEM



                       Installation


                       Assembly
                              8)  There is an optional overflow tube installed on all tanks. If it is to be utilized, a hose will need to be
                                 run from the tanks overflow tube  to a drain that is in accordance with your local and national
                                 codes.





                          Feed to Drainage





                                                            CAUTION

                               Keep in mind that there should be a minimum of 3 feet (91.4 cm) of flexible hose between the
                                                        pump outlet and any hard piping.



                                                            CAUTION

                                THIS PREP JET SYSTEM HAS BEEN SHIPPED WITH TWO SHUT-OFF GUNS, WITH
                               #1NOZZL-MG300 (15 DEG @ 0.7 GPM, MEG NOZZLE) NOZZLES INSTALLED.  THESE
                                     NOZZLES HAVE BEEN PROPERLY SIZED FOR TWO GUN OPERATION
                              If one gun operation is desired, the nozzle must be changed to a #1NOZZL-MG350 (15 DEG @
                              1.5 GPM, MEG NOZZLE).  This will increase the volume of water at the gun and will lengthen
                                                the life of the Unloader Valve and/or the pump itself.



































                        1MANUL603                             Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681                        11
   8   9   10   11   12   13   14   15   16   17   18