Page 260 - Saber® Installation & Startup
P. 260

INSTALLATION & STARTUP

            Chapter 22 Initial Startup Procedure



            High Pressure Wax Option
               1)  Contact  your  chemical  supplier  for  information  on  the  correct  dilution  ratio  for  the  specific
                   chemical you will be using while considering the climate of your location. Dilution is adjusted
                   by changing the induction tip located on the HydroMinder assembly. See image below.













               2)  Adjust the bead chain length to position the float at the desired level of solution. The shorter
                   the chain the higher the liquid level will be when filling the MixStir®.

               3)  Insert chemical pick up tube into the raw chemical container (chemical drum).
                   Note:  Be sure to read the manufacturer supplied “Operation and Safety Notes” at
                          the end of this section.

               4)  Slowly  open  the  previously  installed  water  ball  valve.  Water  flow  will  start  the  siphoning  of
                   chemical concentrate.











































             22-20   Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681    1MANUL290
   255   256   257   258   259   260   261   262   263   264   265