Page 21 - Quad Wave Mitter Signature® Series
P. 21

QUAD WAVE MITTER Signature ® Series


                       Installation

                       Cleaning Material

                              5)  Remove lower inside retainer pins from the lower drive arm.
                              6)  Remove the lower drive arm.
                              7)  Remove 1-1/8” outside rack connector bolt.
                              8)  Remove the bolt locate behind the shaft bearing of the follower rack.
                                                                         Pitman arm
                                   1-1/8” bolt,
                                   (remove for cloth installation, typical)
                                                                                   Retainer pin
                                                   Upper drive arm                 (remove for cloth installation, typical)






                                                  Remove the bolt
                                                  located behind
                                                                           Shaft bearing
                                                  this bearing for   (black urethane plastic) (typical)
                                                  cloth installation
                                                  (typical)
                                                                           Outside collar
                                                                       (anodized aluminum)
                                                                               (typical)




                                                            Lower drive arm
                                                         (remove for cloth installation)

                                                         (View from in between the two racks)





                                Drive Rack                                                Follower Rack


                                                                            ®
                                                                     Mitter Wave  peg
                                                                           (typical)























                        1MANUL634     Belanger, Inc. * PO BOX 5470 * Northville, MI 48167 -5470* Ph (248) 349-7010 * Fax (248) 380-9681      17
   16   17   18   19   20   21   22   23   24   25   26