Page 16 - Wash Around
P. 16
WASH AROUND
Installation
Tunnel Placement
When placing a piece of equipment, tunnel depth will vary from site to site. Be sure to allow an adequate
operating envelope
1) Lower the assembled unit in its permanent location.
2) Level the unit in both directions and lag to the floor.
CAUTION
On all 28” “Wide Based” legs, secure lag bolts in all of the holes.
Overhead View
Center
Line
DIRECTION
of
TRAVEL
45”
The 45” dimension is taken from the inside edge of the inside conveyor guide rail to the outside edge of the equipment leg.
14 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL798