Page 21 - Wash Around
P. 21

WASH AROUND



                       Installation


                       Utilities (Electric Drive)
                       This section will assist you in making the necessary connections top the 3 phase motors atop the side wheels.
                       There are factory mounted junction boxes mounted on the upper leg assemblies.
                          Electrical Connections to Mitter Curtains




                               It is recommended that licensed technicians are contracted to perform all utility installations.
                              1)  Supply 3 phase power and ground to the junction boxes mounted on the upper leg assemblies.
                              2)  Locate the supplied electrical runs. Using field supplied cord grips on the motors,  make
                                 connections from the junction boxes to the electric motor of each side wheel.
                              Note:  Cord Grips not supplied by Belanger, Inc.

                                                               Overhead View


























                                Junction box                                                  Junction box




                                                      Above image shows motor cord grip installed. Cord grip not supplied.

                          Confirming Wheel Rotation
                                                            CAUTION

                                Be sure to match the wheel rotation shown above. If the rotation is opposite as show below,
                                                    reverse two leads of the 3 phase connection.










                        1MANUL798              Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       19
   16   17   18   19   20   21   22   23   24   25   26