Page 21 - Belanger Y-Sections
P. 21
BELANGER Y-SECTIONS
Installation
Assembly of DXD Y-section
14) At the entrance of the Y-Section, the Plastic Guide Rail Covers should be grinded so that there is
a smooth transition from the elbow to the plastic.
Grind here on both
entrances to create
a smooth transition
onto the Y-Section
1MANUL105 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 19