Page 21 - Belanger Y-Sections
P. 21

BELANGER Y-SECTIONS


                       Installation


                       Assembly of DXD Y-section

                              14)  At the entrance of the Y-Section, the Plastic Guide Rail Covers should be grinded so that there is
                                 a smooth transition from the elbow to the plastic.

                                                                             Grind here on both
                                                                             entrances to create
                                                                             a smooth transition
                                                                             onto the Y-Section



































































                       1MANUL105           Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681         19
   16   17   18   19   20   21   22   23   24   25   26