Page 18 - Belanger Y-Sections
P. 18

BELANGER Y-SECTIONS


             Installation


             Assembly of DXD Y-section

                    8)  After all parts have been welded into  place, the angled portion of the Y-Section should be un-
                       bolted from the mounting plate so that the Plastic Guide Rail Covers can be cut and installed.

                                                                  Remove fasteners at the circled locations

















                    9)  The Plastic Guide Rail Covers should be driven onto the angles from the exit end of the welded
                       assembly with the notched end first.
                    10)  The plastic covers will have to be trimmed according to the  style  of  Conveyor you have. The
                       following 2 steps will show how the different styles need to be fabricated.
                       •   If you have a Conveyor with covers on both sides:
                             1.  Trim the covers that are already in place on the Conveyor at the location shown below.
                                Cutting them here will allow a fastening point for both the existing cover on the
                                Conveyor and the cover from the Y-Section (shown below).

                                            Cut covers
                                            between the
                                            2 fasteners






                                      Before                                           After

                             2.  Slide the covers on both sides up until they meet together.
                                                         Butt the new
                                                         covers up to
                                                         the existing
                                                          covers





                                      Before                                           After


                      The above steps will help make for a smooth transition from plastic to plastic.