Page 15 - Belanger Y-Sections
P. 15
BELANGER Y-SECTIONS
Installation
Diagram for DXD Plastic Covered Y-Section
• Find the center of the Conveyor
and project a line onto the
existing Correlator main frame.
• Mark two lines on the Correlator
frame at equal distances on
both sides of center mark.
• More Details on Next Page
Centerline of
Conveyor
The above dimensions are
to be equal distances from
the inside of the vertical
supports
1MANUL105 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 13