Page 15 - Belanger Y-Sections
P. 15

BELANGER Y-SECTIONS


                       Installation


                       Diagram for DXD Plastic Covered Y-Section


                        •  Find the center of the Conveyor
                           and project a line onto the
                           existing Correlator main frame.
                        •  Mark two lines on the Correlator
                           frame at equal distances on
                           both sides of center mark.
                        •  More Details on Next Page



























                                                               Centerline of
                                                                Conveyor

















                                                           The above dimensions are
                                                           to be equal distances from
                                                            the inside of the vertical
                                                                 supports












                       1MANUL105           Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681         13
   10   11   12   13   14   15   16   17   18   19   20