Page 11 - Belanger Y-Sections
P. 11
BELANGER Y-SECTIONS
Installation
Assembly of the Stainless-Steel Y-Section
16) Re-install the back roller supports onto the mounts that you welded.
17) Measure the distance between the back holes of the support to the Conveyor guide rail and cut the
axles to fit.
Be sure to account
for the depth of this
hole when measuring
to cut the axles
Note: If the rollers have to be removed for an overhead door, the sleeves will need to be cut a
little shorter. If this is the case, you will also have to cut the blue roller sleeves for proper
fitting.
20) Measure the gap from Conveyor guide rails to Y-Section mounts.
Standard Stainless Steel Single Optional Stainless Steel Dual
Dotted line
shows close-up
Dotted line on location to
shows close-up measure from
on location to Measure Here Measure Here (typical)
measure from
(typical)
21) Cut the 2” stainless steel rollers to size remembering to allow space for the blue plastic bushings.
22) Re-install the blue bushing to the ends of the roller.
Note: Roller should be cut with a clearance between 1/8” to 3/16” so roller turns freely.
1MANUL105 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 9