Page 7 - Belanger Y-Sections
P. 7

BELANGER Y-SECTIONS


                       Introduction


                       Before You Get Started

                              Tools needed for installation:

                                  Experienced Welder and safety clothing (as listed below)
                                  hammer drill with 1/2” (13 mm) bit                   level
                                  tape measure (12 foot [3.7 meters] or greater)       tin snips
                                  25 foot (8 meters) extension cord                    safety glasses
                                  miscellaneous hand tools                             work gloves

                                  welder                                               welding helmet
                                  torch                                                disc grinder

                                                            CAUTION

                              The driver’s side main Correlator frame should be centered on the Conveyor. If
                               the Conveyor and/or the Correlator frame was installed off center, you should
                              carefully inspect your sites turning radius to evaluate your situation. If  turning
                               radius is inadequate, you may have to alter the placement of your Correlator.
                              When all else fails, call Belanger Customer Service for advice before proceeding
                                                          with installation process.