Page 23 - Top Wheel Signature® Series
P. 23

SignatureSignature   SeriesSeries
                      TOP WHEEL SignatureSignature  ®      SeriesSeries

                      Installation


                      Frame Assembly

                          Tunnel Placement
                          As stated earlier, tunnel depth placement will vary from site to site. The images below show the
                          correct side-to-side placement.
                             Note:  The  image  below  is  shown  with  the  Over-Under  Conveyor  option.  Your
                                    system may have the standard Guide Rails. Placement is the same for both.
                                                             Overhead View





























                                                                 Direction
                                             47-1/2”             of Travel



                             Note:  The 47-1/2” dimension is taken from the outside driver side leg base plate
                                    to the inside guide rail.























                       1MANUL752            Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        19
   18   19   20   21   22   23   24   25   26   27   28