Installation
Frame Assembly
Tunnel Placement
As stated earlier, tunnel depth placement will vary from site to site. The images below show the
correct side-to-side placement.
Note: The image below is shown with the Over-Under Conveyor option. Your
system may have the standard Guide Rails. Placement is the same for both.
Overhead View
Direction
47-1/2” of Travel
Note: The 47-1/2” dimension is taken from the outside driver side leg base plate
to the inside guide rail.