Page 14 - Wave Across™ Signature® Series
P. 14
WAVE ACROSS™ Signature ® Series
Installation
Frame Assembly
The Head Assembly has the water manifolds secured into place at the factory. Determine which
side has the main water feed and be sure that side is oriented on the side of the utility room. See
image below.
1) Place the head assembly in its approximate tunnel location. Using a forklift, strap the head
assembly securely to the forks and raise above the height of the support legs.
Note: Be sure to clamp or strap equipment securely to the forks of the forklift before lifting
equipment. Do not stand under load while fork lift is in operation
2) Locate the leg assemblies and the following fasteners.
1/2-13 x 6-1/2” bolts (8) 1/2” lock washers (8) 1/2” flat washers (16) 1/2” nuts (8)
3) Secure the legs to the head assembly as shown below.