Page 15 - Wave Across™ Signature® Series
P. 15

WAVE ACROSS™ Signature ® Series


                       Installation

                       Tunnel Placement

                       When  placing  a  piece  of  equipment,  tunnel  depth  will  vary  from  site  to  site.  Be  sure  to  allow  an
                                                                  ®
                       adequate operating envelope. The Wave Across  can be installed facing either direction as there is
                       no entrance or exit side.
                          1)  Position the assembled unit in its permanent tunnel location.
                          2)  While placing a level on the vertical surface of one of the legs, place shims under the base
                              plate as needed to make the assembly level in both directions. Repeat this leveling process
                              on the other leg.
                              Note:  Shims not supplied by Belanger, Inc.

                          3)  Once the assembly is positioned correctly and level, lag it to the floor using the supplied lag
                              bolts.









                                                              DIRECTION
                                                                  of
                                                               TRAVEL



























                                  45”                            Center
                                                                 Line



                       The 45” dimension is taken from the inside edge of the inside conveyor guide rail to the outside edge of the equipment leg.









                        1MANUL851     Belanger, Inc. * PO BOX 5470 * Northville, MI 48167 -5470 * Ph (248) 349-7010 * Fax (248) 380-9681     11
   10   11   12   13   14   15   16   17   18   19   20