Page 16 - Wave Across™ Signature® Series
P. 16

WAVE ACROSS™ Signature ® Series


             Installation

             Utilities

                Main Water Feed
                    1)  Secure a field supplied hose and clamp the main water feed located atop the frame on
                       the manifold described earlier as shown below.

              3/4” Main Water Feed



















                Main Electrical Feed

                                                  CAUTION

                         It is recommended that a licensed electrician is contracted to
                                        perform all electrical installations.

                    1)  Supply 3-phase power to the motor on top of the frame assembly.