Page 18 - Foaming Pods
P. 18
FOAMING PODS
Installation
Mounting Distribution Manifold to 4” Frame
Triple Foaming Pods: If you have purchased the Triple Foaming Pods, you will have received a
Distribution Manifold. See below for details on how and where to mount the Distribution Manifold
to the crossbeam of the Single Arch using the supplied fasteners (fasteners included in
accessory box) and the recommended mounting location.
Secure Block using supplied
Use #25 (.1495) drill / 10-24 tap fasteners and lock-washers
Crossbeam Preparation for Mounting Triple Foaming Pods
The crossbeam of the Single Arch will need to be drilled and tapped to mount the Distribution
Manifold. See details below.
Top View
65”
Helpful Hint
The 65” dimension is taken from the outside edge of the leg to the center-point of the Distribution
Manifold (see close-up below).
Bolts: 10-24 x 1-1/2” socket head
Center-line of Distribution Block Washers: #10 lock-washers
Single Foaming Pods: If you have have purchaed the Single Pod system a Distribution Manifold
is not needed. The hosed will be Tee’d together. Details to follow.
16 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL770