Page 18 - Foaming Pods
P. 18

FOAMING PODS


            Installation


            Mounting Distribution Manifold to 4” Frame

               Triple Foaming Pods: If you have purchased the Triple Foaming Pods, you will have received a
               Distribution Manifold. See below for details on how and where to mount the Distribution Manifold
               to the crossbeam of the Single Arch using the supplied fasteners (fasteners included in
               accessory box) and the recommended mounting location.












                                                                           Secure Block using supplied
                  Use #25 (.1495) drill / 10-24 tap                        fasteners and lock-washers

               Crossbeam Preparation for Mounting Triple Foaming Pods
               The crossbeam of the Single Arch will need to be drilled and tapped to mount the Distribution
               Manifold. See details below.

               Top View
                                           65”



                                                     Helpful Hint
                    The 65” dimension is taken from the outside edge of the leg to the center-point of the Distribution
                                               Manifold (see close-up below).









                                                                              Bolts: 10-24 x 1-1/2” socket head
                                                Center-line of Distribution Block   Washers: #10 lock-washers
               Single Foaming Pods: If you have have purchaed the Single Pod system a Distribution Manifold
               is not needed. The hosed will be Tee’d together. Details to follow.


















             16        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681          1MANUL770
   13   14   15   16   17   18   19   20   21   22   23