Page 57 - Sudzer® BL & FM
P. 57

®
                       SUDZER  BL & FM



                       Chapter 4 Sudzer® FM Installation

                       Sudzer® FM Assembly
                                                ®
                          Installing the Sudzer  FM Nozzles
                          7)  After the chemical and air hoses have been connected to a Nozzle install the Nozzle into the
                              Air  Plenum.  Rotate  the  Nozzles  to  the  left  so  that  the  keyed  flange  will  fit  into  the  keyed
                              opening in the Air Plenum, as shown below.






                                                                                                  Air Plenum







                            Hoses for the Chemical
                            Solution & Compressed
                            Air are connected to the                                          Chemical Solution &
                            Utility Manifold                                                  Compressed Air are
                                                                                              connected to Nozzle





                                                                                               Nozzle


                          8)  If the the Optional RGB LED Nozzles were purchased the electrical wires for the Nozzle LEDs
                              will need to be connected before the Nozzles are installed into the Air Plenum.

                                   Route the LED Harness Assembly from the Utility Mount Plate through the Air Plenum
                                    align the six electrical plugs on the harness with each of the Nozzle Outlets in the Air
                                    Plenum.
                                   Before  connecting  the  quick  connectors  between  the  Wire  Harness  and  the  Nozzle
                                    LED apply a small amount of dielectric grease to the receptor side of the connection.
                                   Connect the electrical plug from the Wire Harness into the electrical receptor on the
                                    LED in the Nozzle, as shown below.


                                                                                                Plug from LED Wire Harness
                                                                                                Receptor for LED in Nozzle







                                                                           Note:  Apply  a  small  amount  of  dielectric
                                                                                  grease  on  the  receptor  side  of  the
                                                                                  connection and push the connectors
                                                                                  together making sure to align them

                                                                                  for a proper seat.