Page 60 - Sudzer® BL & FM
P. 60
®
SUDZER BL & FM
Chapter 4 Sudzer® FM Installation
®
Sudzer FM Assembly
Tunnel Placement
5) Before lagging the driver side leg in place verify the leg is plumb in all directions using a level.
6) Shims may be used under the foot plate if necessary to make the driver side leg level.
7) Measure from the floor or conveyor surface to the tip of the Nozzle closest to the driver side
leg this measurement should be 95-¾”, as shown in the image below.
Output Nozzles
Driver Side Passenger Side
95-3/4”
Height Clearance
Floor Line
Conveyor View of the arch facing the ENTRANCE side of the
Sudzer and the EXIT side of the tunnel
®
®
Note: Later this same measurement will be taken on the passenger side to ensure that the Sudzer
is level from the driver side to the passenger side.