Page 59 - Sudzer® BL & FM
P. 59

®
                       SUDZER  BL & FM



                       Chapter 4 Sudzer® FM Installation

                               ®
                       Sudzer  FM Assembly
                          Tunnel Placement
                          Before standing the Sudzer up, the location for the driver side leg must be marked on the floor, as
                          that will be the first leg mounted.  The foot on the driver side leg will be positioned using the inside
                          edge of the guiderail as a reference point.  Also, when placing a piece of equipment, tunnel depth
                          will vary from site to site. Be sure to allow an adequate operating envelope.

                          1)  Using  a  tape  measure,  measure  43-1/4”  from  the  inside  edge  of  the  guiderail  toward  the
                              driver side of the tunnel and mark a line for this dimension on the floor.
                                                                   ®
                          2)  With a person on each side of the Sudzer , start lifting the Air Plenum near the legs until it is
                              about 3’ high.  If the legs start to slide put a heavy object in front of the legs to prevent the unit
                              from moving.
                          3)  As the unit continues to be erected each person will transition their hands from the Plenum to
                              the legs. Be sure to keep one hand on the exit side of the leg to control the upward motion
                              and to stop the momentum of the plenum once the Sudzer is upright.
                          4)  Position the OUTSIDE edge of the driver side foot plate on the marked line which should be
                                                                                             ®
                              43-1/4”  from  the  inside  edge  of  the  guiderail  and  confirm  the  Sudzer   is  positioned  at  the
                              desired location lengthwise in the tunnel.
                                                                                Air Plenum            Cord Grips for
                                                                                                      Electrical Wires






                                                                                                     Air Plenum with Utility
                                                                                                     Mount Plate includes
                                                            Output Nozzles                          hookups for Pneumatic
                                                                                                      & Solution Feeds



                                            Leg Assembly                          Leg Assembly on
                                            on Driver Side                        Passenger Side
                            Driver Side                                                              Passenger Side





                                            43-1/4”
                        Outside edge                        Inside of Conveyor Guiderail
                        of Driver Side                                              Floor Line
                         Foot Plate


                                       Conveyor                  View of the arch facing the ENTRANCE side of the
                                                                        ®
                                                                    Sudzer  and the EXIT side of the tunnel


                                Note: Confirm the outside edge of the driver side foot plate is 43-1/4” from the inside edge of the

                                      guiderail. Take this measurement at the entrance and exit end of the foot plate to confirm
                                      that the leg is square to the conveyor.


                        1MANUL026        Belanger, Inc.® * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681   4-9
   54   55   56   57   58   59   60   61   62   63   64