Page 177 - Revit Architecture Basics
P. 177

Shared coordinates




                  6.    When the building is correctly located in relation to the terrain,
                        the coordinates of the terrain file are transferred to the course
                        project via:

                        Manage ► Project Location ► Coordinates ► Publish
                        Coordinates




                  7.    Select the linked Construction model and click OK in the dialog
                        box


                  8.    Coordinates are saved in the Course Project by:
                        Right-click the link in Project Browser and click Save Sites


                        Click Save in the dialog box, and terrain file's coordinate
                        system is now transferred to the building model


                  9.    Close terrain file again without saving


                  Opgave – Import af Toposurface og Situationsplan

                  Purpose: to understand how a Toposurface is imported and a Situation plan is created


                  1.    Open Course project and navigate to 3D View

                  2.    Terrain file must be linked into the model through



                        Insert ► Link Revit


                        Select the file ”Terræn.rvt” and under Positioning: select ”Auto -
                        By Shared Coordinated”


                  3.    Navigate to (01) Stue and create a Duplicate
                        Enter a name for the new View ”Situationsplan” and select it in Project Browser














                   NTI                                                                                     177
   172   173   174   175   176   177   178   179   180   181   182