Page 11 - Parkside Gasification & Pellet Plant Report 081117_Neat
P. 11

8085   1093  1677
                                        MWHr




                                        Electrical Energy Summary  Total generated capacity  Existing plant consumption  New plant consumption  160kW hammermill  355kW main motor on press
















                                     Personnel   Req. FTE  5  1  0.5  0.25      0.5




                                     Total   mWhrs  313.6  779.52  389.76  3.36  15.36  64.512  9.984  4.608  9.216  64.512  23.04  1677.472


                                     Total   kWhrs  313600  779520  389760  3360  15360  64512  9984  4608  9216  64512  23040



                                     Hours    Operating  7000  1680  840  840  1920  1920  1920  1920  1920  1920  1920



                                        Installed kW  56  580  580  5  0  10  42  6.5  3  6  42  15  Total







                                                                                Est.
                                            7,140,000.00  30,000.00  2,550,000.00  80,000.00  250,000.00  400,000.00  120,000.00  20,000.00  40,000.00  120,000.00  195,000.00  110,000.00  120,000.00  100,000.00  300,000.00  400,000.00  200,000.00  900,000.00  150,000.00  13,225,000.00


                                        Est cost  $       $            $       $               $          $          $          $            $            $          $          $          $          $          $          $          $          $          $          $


                      7000  840  1440       7  1   1        1   1    1   1      1  1  2  1  1  1  1  1  1  1  1  1  1

                                        Qty.


















                      Hours of Gasifier operation p.a. Stage 1 Fuel consumption kg/ hr  Stage 2 Fuel consumption kg/ hr   Equipment required Burkhardt gasifiers  7 x 165kW, pellet fuel feeding conv, ash removal  conveyor, spares kit, commissioning Cycle H/W to / from kiln based H.E's CPM pellet Cube 6mm pellets, capacity 4.0 T / hr, (run for 7 hrs / day, 5  days / week) Total kW TBC Installation supervision incl.   CPM runs for 3.5 hrs / day nightshift Pellet packaging line. Capacity 6 bags / min = 5.4T / hr Concrete floor and sandwich panel wall bunker 240m3 cap. Javo toploader and takeaway conveyor complete incl. installation  located inside new building Flash /







                   PARKSIDE GROUP ‐ ENERGY MASS BALANCE








                                            100  150  200   300  320     400    450  451  452  460  500  600  650  670  700  800  810  900  920
                                        Item #

                                            5880   5040  840  3,000                      1700     600   13,230
                                        Tonnes
                      Gasifiers to be Burkhardt 165kW modules running on 6mm dia pellets








                        7 x 165kW = 1.15MW / Hr of electrical energy 7 x 260kW = 1.89MW / Hr of Thermal energy Stage 1 will be 7x 165kW gasifiers.  Total 1.15MW El and 1.82MW Th Stage 2 will be a further 5x 165kW gasifiers.  Total 1.96MW El and 3.12MW Th.  Stage 1 Fuel consumption Tonnes / year in the gasifier (120x 165kW) Pipe work from gasifiers to heat exchangers at the kilns  CPM pellet press 6mm production / p.a. Fuel shortfall from dried green mill sawdust  Pellets for retail sale  Pellet packaging line Bunker for sawdust receival including unloading screw /   conveyor  Flash Drier for sawdust FLR1000  Dried sawdust storage silo #1  Storage silo #2 planermil
   6   7   8   9   10   11   12   13   14   15   16