Page 11 - Parkside Gasification & Pellet Plant Report 081117_Neat
P. 11
8085 1093 1677
MWHr
Electrical Energy Summary Total generated capacity Existing plant consumption New plant consumption 160kW hammermill 355kW main motor on press
Personnel Req. FTE 5 1 0.5 0.25 0.5
Total mWhrs 313.6 779.52 389.76 3.36 15.36 64.512 9.984 4.608 9.216 64.512 23.04 1677.472
Total kWhrs 313600 779520 389760 3360 15360 64512 9984 4608 9216 64512 23040
Hours Operating 7000 1680 840 840 1920 1920 1920 1920 1920 1920 1920
Installed kW 56 580 580 5 0 10 42 6.5 3 6 42 15 Total
Est.
7,140,000.00 30,000.00 2,550,000.00 80,000.00 250,000.00 400,000.00 120,000.00 20,000.00 40,000.00 120,000.00 195,000.00 110,000.00 120,000.00 100,000.00 300,000.00 400,000.00 200,000.00 900,000.00 150,000.00 13,225,000.00
Est cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
7000 840 1440 7 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1
Qty.
Hours of Gasifier operation p.a. Stage 1 Fuel consumption kg/ hr Stage 2 Fuel consumption kg/ hr Equipment required Burkhardt gasifiers 7 x 165kW, pellet fuel feeding conv, ash removal conveyor, spares kit, commissioning Cycle H/W to / from kiln based H.E's CPM pellet Cube 6mm pellets, capacity 4.0 T / hr, (run for 7 hrs / day, 5 days / week) Total kW TBC Installation supervision incl. CPM runs for 3.5 hrs / day nightshift Pellet packaging line. Capacity 6 bags / min = 5.4T / hr Concrete floor and sandwich panel wall bunker 240m3 cap. Javo toploader and takeaway conveyor complete incl. installation located inside new building Flash /
PARKSIDE GROUP ‐ ENERGY MASS BALANCE
100 150 200 300 320 400 450 451 452 460 500 600 650 670 700 800 810 900 920
Item #
5880 5040 840 3,000 1700 600 13,230
Tonnes
Gasifiers to be Burkhardt 165kW modules running on 6mm dia pellets
7 x 165kW = 1.15MW / Hr of electrical energy 7 x 260kW = 1.89MW / Hr of Thermal energy Stage 1 will be 7x 165kW gasifiers. Total 1.15MW El and 1.82MW Th Stage 2 will be a further 5x 165kW gasifiers. Total 1.96MW El and 3.12MW Th. Stage 1 Fuel consumption Tonnes / year in the gasifier (120x 165kW) Pipe work from gasifiers to heat exchangers at the kilns CPM pellet press 6mm production / p.a. Fuel shortfall from dried green mill sawdust Pellets for retail sale Pellet packaging line Bunker for sawdust receival including unloading screw / conveyor Flash Drier for sawdust FLR1000 Dried sawdust storage silo #1 Storage silo #2 planermil