                       •   Poor management of Volunteer services in regard to   •   Challenges with Transportation
                         Transportation, Meals, Kitting, allowances.
                       •   Failure to Utilize MPLS services between KU and   Advise to next LOC
                         Kasarani
                       •   Delays with sponsorship engagements of critical part-  •   Start all preparations very early
                         ners for the event                          •   Have all available resources before the start of the event
                       •   Downtime at KU based on an overload of the network   •   Prepare Accreditation list in advance to avoid unneces-
                         for upto 4hrs on day one                      sary last minute rush and changes
                       •   No Power Backup at KU due to delays of approvals for   •   Test all equipment/Technology before the event
                         the backup services                         •   Suffi  cient budget for the event
                       •   Insuffi  cient printing paper for Accreditation due to
                         various changes in access rights for individuals  Capacity utilization
                       •      eft and Vandalism of installed ICT equipment was
                         a very big challenge                        We collectively utilized more than 750 MBPS