Page 164 - World Under 18 Championships
P. 164

WORLD U18











                       Project Landscaping Architect. Polycarp       •  Provide gymnasium facilities to the athletes;
                       Mogusu provided technical support in landscap-  •  Provide short term emergency standby- power gen-
                       ing details and specifi cation as well as supervision   erator;
                       of the landscaping works.                     •  Perform landscaping of the grounds;
                                                                     •  Provide a lounge where athletes, team offi  cials, guests
                       Project Electrical Engineer Robert Kirui was    and the media can interact
                       responsible for design and supervision of all electri-
                       cal works on site.                            ICT (Information, Communication and
                                                                     Technology)
                       Project Mechanical Engineer: Simon Kimutai    •  Provide the LOC Directorate of ICT with the overriding
                  KYEB
                       was responsible for design and supervision of all
                                                                       infrastructure on which to provide network services;
                       mechanical works on site.
                                                                     •  To provide the underlying fi bre optic cabling within
                                                                       Nyayo Village
                       Project Civil Engineer. Joanne Mahugu: was
                                                                     •  To provide specialized personnel to support the IT
                       responsible for design and supervision of all civil
                                                                       infrastructure
                       works on site.
                                                                     Medical
                       Project Structural Engineer. Janet Kahuro: was
                       responsible for design and supervision of all struc-
                                                                     •  Provide standalone medical/ doping control rooms
                       tural works on site.
                                                                       with toilets in each anti-doping room.
                       Project Procurement Manager. Victoria
                                                                     •  Provide fully operational health unit staff ed with medi-
                                                                       cal personnel Provide secluded massage areas with
                       Muema: was responsible for procurement of ma-
                                                                       closet space.
                       terials and to ensure timely delivery.
                     KENYA  YEARBO0K
                                                                     Technical
                       Scope of Work
                                                                     •  Provide two secluded training sections, for throws,
                          e scope of work for refurbishing the Nyayo Village
                                                                       jumps and another for running;
                       was a follows:
                      EDITORIAL BOARD
                                                                     •  Provide fl ood lights for the training grounds.
                                                                     •  Provide and install an IAAF approved tartan track at
                       Accommodation
                                                                       the Nyayo village
                       •  Provide lockable 3-star standard rooms for 2,000
                         athletes;                                   Marketing and Commercial
                       •  Provide ablution facilities of a 3-star standard ac-
                         commodation.                                •  Provide fl ag poles for raising the respective fl ags;
                       •  Provide a 3-star kitchen, assured cold chain and   •  Provide mounting facilities, signage, banners, bun-
                         kitchen staff  to run it;                      tings and water points.
                       •  Provide cleaning services to the athletes’ village and
                         the training grounds;                       Security
                       •  Provide storage space for athlete’s equipment;
                       •  Provide common areas for use by the athletes as en-  •  Provide adequate security offi  ces and a holding cell
                         tertainment area                              with a toilet;















               164 |  ACTIVITIES AND OCCURENCES DURING WORLD U18 CHAMPIONSHIPS