Rick Lepre

                                         Preconstruction/Construction Analysis Resource


         EDUCATION
         Dean College
         AAS Building Construction

         YEARS OF EXPERIENCE
         43
         PERCENTAGE OF TIME COMMITMENT
         As needed during preconstruction and
         construction
         OFFICE LOCATION
         Tampa









        Rick will be the Preconstruction/Construction Analysis Resource on this project.  He will be actively involved with the project
        throughout its duration and will ensure that the project receives all necessary support from within the organization as well
        as from ancillary team members.

        SIMILAR PROJECTS

        Bayer Healthcare -  U.S. Corporate HQ                  total re-design of interior lobbies and amenity areas. Th is project
        675,000 SF, $75 million. Th  e new Class A U. S. Headquarters for  included the construction of a brand new 500 space parking structure
        Bayer Healthcare was constructed in two phases. Th e fi rst linked  adjacent to the building.
        two existing offi  ce structures with a fi ve-story glass atrium. Each
        of the structures was renovated; one with a two-story vertical  Jetro - Corporate Headquarters
        addition. In addition to these Class A offi  ce buildings, one of the  70,000 SF, $42 million. Th  is project comprises a new from the
        existing research buildings was rejuvenated as a fi tness center. As  ground up 4 story  70,000 sf Class “A” headquarters building with an
        part of this phase, approximately 2,500 on-grade parking spaces  adjacent precast parking structure. Pre-con has started with a target
        was constructed within parking fi elds surrounding the buildings.  for shovel in the ground this summer. Th  e Owner was impressed
                                                               with the hands on construction knowledge shown at the interview
        MetLife –  Investment HQ & 425 Car Garage              which was a deciding factor.
        200,000 SF, $40 million. Th  is four story Class A offi  ce building
        was constructed on an 11 acre site adjacent to our completed Bayer  Datascope Corp. - Research and Development Laboratories
        Pharmaceuticals Headquarters facility. Th  is new Headquarters  130,000 SF. Project included 90,000 SF of electronic research and
        for MetLife Investments includes offi  ce space, open collaborative  development laboratories along with corporate management and
        work spaces, conference rooms, a full serving kitchen and cafeteria.  marketing offi  ces. All operations were supported by a high security
                                                               LAN system operating from a 9,000 SF data center. Special challenges
        Crum & Forster –  Corporate HQ & 500 Car Parking Garage  on this project included removal of over 130,000 c.y. of excess soils
        200,000 SF, $46 million. Th  is project is a complete gut and “re-skin”  from the site and reconciling the detailing of the unique material
        of their existing four story building, transforming the structure  application specifi ed for the building façade.
        into a modern Class A Headquarters. Th  is project will include the


















         MetLife HQ                                             Bayer HQ
   48   49   50   51   52   53   54   55   56   57   58