Rick Lepre
Preconstruction/Construction Analysis Resource
EDUCATION
Dean College
AAS Building Construction
YEARS OF EXPERIENCE
43
PERCENTAGE OF TIME COMMITMENT
As needed during preconstruction and
construction
OFFICE LOCATION
Tampa
Rick will be the Preconstruction/Construction Analysis Resource on this project. He will be actively involved with the project
throughout its duration and will ensure that the project receives all necessary support from within the organization as well
as from ancillary team members.
SIMILAR PROJECTS
Bayer Healthcare - U.S. Corporate HQ total re-design of interior lobbies and amenity areas. Th is project
675,000 SF, $75 million. Th e new Class A U. S. Headquarters for included the construction of a brand new 500 space parking structure
Bayer Healthcare was constructed in two phases. Th e fi rst linked adjacent to the building.
two existing offi ce structures with a fi ve-story glass atrium. Each
of the structures was renovated; one with a two-story vertical Jetro - Corporate Headquarters
addition. In addition to these Class A offi ce buildings, one of the 70,000 SF, $42 million. Th is project comprises a new from the
existing research buildings was rejuvenated as a fi tness center. As ground up 4 story 70,000 sf Class “A” headquarters building with an
part of this phase, approximately 2,500 on-grade parking spaces adjacent precast parking structure. Pre-con has started with a target
was constructed within parking fi elds surrounding the buildings. for shovel in the ground this summer. Th e Owner was impressed
with the hands on construction knowledge shown at the interview
MetLife – Investment HQ & 425 Car Garage which was a deciding factor.
200,000 SF, $40 million. Th is four story Class A offi ce building
was constructed on an 11 acre site adjacent to our completed Bayer Datascope Corp. - Research and Development Laboratories
Pharmaceuticals Headquarters facility. Th is new Headquarters 130,000 SF. Project included 90,000 SF of electronic research and
for MetLife Investments includes offi ce space, open collaborative development laboratories along with corporate management and
work spaces, conference rooms, a full serving kitchen and cafeteria. marketing offi ces. All operations were supported by a high security
LAN system operating from a 9,000 SF data center. Special challenges
Crum & Forster – Corporate HQ & 500 Car Parking Garage on this project included removal of over 130,000 c.y. of excess soils
200,000 SF, $46 million. Th is project is a complete gut and “re-skin” from the site and reconciling the detailing of the unique material
of their existing four story building, transforming the structure application specifi ed for the building façade.
into a modern Class A Headquarters. Th is project will include the
MetLife HQ Bayer HQ